Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

The login landing page when selecting 'View' is still occurring and is still pending further investigation. 

Permit Details

Status:
Complete
Type:
Model Building Permit
Address NEW:
3468 S 9TH AV UNIT 1
Apply Date:
02/03/2026
Applicant:
Ramon VALDEZ
Description:
Duplex SFR & ADU (Model master plan TC-MDP-1224-01416)

Permit Reviews

Permit Number - TC-MDP-0126-00005
Permit Status: Complete
Permit Description: Duplex SFR & ADU (Model master plan TC-MDP-1224-01416)
Start Date Submittal Complete Date Status  
03/02/2026 SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.3 03/18/2026 APPROVED Review Details
09/15/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.1 09/16/2026 APPROVED Review Details
02/02/2026 SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1 02/02/2026 REQUIRES RESUBMIT Review Details
03/19/2026 ADMINISTRATIVE v.2 N/A APPROVED Review Details
03/18/2026 ADMINISTRATIVE v.1 03/18/2026 REQUIRES RESUBMIT Review Details
02/05/2026 SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.2 02/20/2026 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-MDP-0126-00005
Permit Status: Complete
Permit Description: Duplex SFR & ADU (Model master plan TC-MDP-1224-01416)
Date Description Comments
02/02/2026 Plans indicate Units 1 and 2. Please contact Pima County Addressing to add Unit 1 and Unit 2 to the address. Addressing@pima.gov or 520-724-9512
01/06/2026 Submit the Air Leakage & Duct Tightness Test Report completed by an Approved Special Inspector prior to Final Inspections.
03/17/2026 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
01/06/2026 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
01/06/2026 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
01/06/2026 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0126-00005
Permite Description: Duplex SFR & ADU (Model master plan TC-MDP-1224-01416)
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
09/15/2026 COT - BULD - SWG Clearance N/A Not Applicable
09/15/2026 COT - RSEL - Electrical Underground N/A Not Applicable
09/15/2026 COT - RSPL - Gas Pressure Test N/A Not Applicable

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0126-00005
Permit Description: Duplex SFR & ADU (Model master plan TC-MDP-1224-01416)
Total Completed Inspections - 17
Date Description Inspector Results Comments
03/23/2026 COT - RSPL - Rough Soil Passed Okay to backfill. Shading required. 3/23/2026
03/23/2026 COT - RSPL - Sewer Passed Okay to backfill. Shading required. 3/23/2026
03/23/2026 COT - RSPL - Yard Water Line Passed Okay to backfill. Shading required. 3/23/2026
03/26/2026 COT - RSBU - Excavation/Rebar/Zoning Passed
03/26/2026 COT - RSBU - Preslab Passed
04/13/2026 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 04/13/2026
Approved per plan.
04/13/2026 COT - RSBU - Roof Nailing Passed 04/13/2026
Approved per plan.
04/15/2026 BULD - Electrical Clearance Passed 4/15/2026
Approved clearance TEP ECO. Duplex at 3468 S 9th Ave, Unit 1 & Unit 2.
04/15/2026 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
09/15/2026 COT - RSBU - Interior Shear Bracing Passed
09/15/2026 COT - RSEL - Electrical Final Passed
09/15/2026 COT - RSEL - Outdoor Lighting Passed
09/18/2026 COT - RSME - Mechanical Final Passed
09/18/2026 COT - RSPL - Plumbing Final Passed
09/18/2026 ENGR Engineering Final Passed
09/18/2026 RSBU - Building Final Passed
09/18/2026 RSBU - Building Progress Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL (SSRS).PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
9TH RESPONSE_V2.PDF DOCUMENTS VIEW
CONS-9TH_V3.PDF DOCUMENTS VIEW