Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/15/2026 | ENGR Engineering Final | Not Ready | 9/15/26 -Weep screed needs to be 4" clear of DG. It is not clear where sidewalk meets house. -South yard landscape tree (15 gal Mesquite) in a water harvesting area is not in place per plan. -The accessible route sidewalk was not built per plan and is under the roofline causing the roof to drain onto it. I would recommend installing gutters to prevent storm water from falling onto the sidewalk. Another option would be to re pour the sidewalk per plan. -Conditions on permit are not satisfied prior to final inspection. |
|
| 09/18/2026 | ENGR Engineering Final | Passed |