Permit: TC-MDP-0126-00001
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
3241 S CAPRI CI UNIT 1
Address NEW:
3241 S CAPRI CI UNIT 1
Apply Date:
01/05/2026
Applicant:
Ramon VALDEZ
Description:
Duplex SFR & ADU (Model master plan TC-MDP-1224-01416)
Permit Reviews
Permit Number - TC-MDP-0126-00001
Permit Status: Inspections complete
Permit Description: Duplex SFR & ADU (Model master plan TC-MDP-1224-01416)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/14/2026 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1 | 01/30/2026 | REQUIRES RESUBMIT |
| 02/19/2026 | ADMINISTRATIVE v.1 | 02/19/2026 | REQUIRES RESUBMIT |
| 03/02/2026 | ADMINISTRATIVE v.2 | N/A | APPROVED |
| 02/05/2026 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.2 | 02/19/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0126-00001
Permit Status: Inspections complete
Permit Description: Duplex SFR & ADU (Model master plan TC-MDP-1224-01416)
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 01/06/2026 | Submit the Air Leakage & Duct Tightness Test Report completed by an Approved Special Inspector prior to Final Inspections. |
Conditions
Permit Number - TC-MDP-0126-00001
Permit Status: Inspections complete
Permit Description: Duplex SFR & ADU (Model master plan TC-MDP-1224-01416)
| Date | Description | Comments |
|---|---|---|
| 01/06/2026 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 01/06/2026 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
| 01/06/2026 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0126-00001
Permite Description: Duplex SFR & ADU (Model master plan TC-MDP-1224-01416)
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/07/2026 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
| 05/07/2026 | COT - RSEL - Electrical Underground | N/A | Not Applicable | |
| 05/07/2026 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0126-00001
Permit Description: Duplex SFR & ADU (Model master plan TC-MDP-1224-01416)
Total Completed Inspections - 17
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/03/2026 | COT - RSPL - Rough Soil | Passed | Okay to backfill. Shading required. 3/3/2026 | |
| 03/03/2026 | COT - RSPL - Sewer | Passed | Okay to backfill. Shading required. 3/3/2026 | |
| 03/03/2026 | COT - RSPL - Yard Water Line | Passed | Okay to backfill. Shading required. 3/3/2026 | |
| 03/06/2026 | COT - RSBU - Preslab | Passed | 3/6/2026 string line was in place to verify proper line as the current fence is at a curb. All other corrections were made. Okay for concrete placement. | |
| 03/06/2026 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 3/6/2026 string line was in place to verify proper line as the current fence is at a curb. All other corrections were made. Okay for concrete placement. | |
| 03/31/2026 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 03/31/2026 | COT - RSBU - Roof Nailing | Passed | ||
| 04/03/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 4-3-26: residential intermediates approved. | |
| 04/03/2026 | BULD - Electrical Clearance | Passed | 4-3-26: okay to energize panel at unit's 1& 2. ECO clearance issued to TEP. | |
| 05/07/2026 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 05/07/2026 | COT - RSEL - Electrical Final | Passed | ||
| 05/07/2026 | COT - RSEL - Outdoor Lighting | Passed | ||
| 05/07/2026 | COT - RSME - Mechanical Final | Passed | ||
| 05/07/2026 | COT - RSPL - Plumbing Final | Passed | ||
| 05/07/2026 | ENGR Engineering Final | Passed | ||
| 05/07/2026 | RSBU - Building Final | Passed | ||
| 05/07/2026 | RSBU - Building Progress | Passed |