Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
05/02/2025
Applicant:
Description:
SFR RKM45R T21-M0093 (REVISION Delta 4) (Model master plan TC-MDP-1222-00031)

Permit Reviews

Permit Number - TC-MDP-0125-00052
Permit Status: Inspections complete
Permit Description: SFR RKM45R T21-M0093 (REVISION Delta 4) (Model master plan TC-MDP-1222-00031)
Start Date Submittal Complete Date Status  
05/06/2025 SITE FROM MODEL PERMIT - PRODUCTION v.1 05/13/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0125-00052
Permit Status: Inspections complete
Permit Description: SFR RKM45R T21-M0093 (REVISION Delta 4) (Model master plan TC-MDP-1222-00031)
Total Outstanding Activity Conditions - 3
Date Name
01/28/2025 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
05/06/2025 Post-Installed Anchor Inspection Report is required.
05/06/2025 Post-Tension Inspection Report is required.

Conditions

Permit Number - TC-MDP-0125-00052
Permit Status: Inspections complete
Permit Description: SFR RKM45R T21-M0093 (REVISION Delta 4) (Model master plan TC-MDP-1222-00031)
Date Description Comments
01/28/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
01/28/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0125-00052
Permit Description: SFR RKM45R T21-M0093 (REVISION Delta 4) (Model master plan TC-MDP-1222-00031)
Total Completed Inspections - 22
Date Description Inspector Results Comments
06/06/2025 COT - RSPL - Backwater Valve Passed
06/06/2025 COT - RSPL - Rough Soil Passed
06/06/2025 COT - RSPL - Sewer Passed
06/06/2025 COT - RSPL - Yard Water Line Passed
06/18/2025 COT - RSEL - Electrical Underground Passed
06/23/2025 COT - RSBU - Excavation/Rebar/Zoning Passed 6/23/25 corrections made
06/23/2025 COT - RSBU - Preslab Passed Passed 6/23/25 corrections made
08/08/2025 COT - RSPL - Gas Pressure Test Passed
08/12/2025 COT - BULD - SWG Clearance Passed
08/12/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 8.12.25
corrections made
08/12/2025 COT - RSBU - Roof Nailing Passed
08/14/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
08/14/2025 BULD - Electrical Clearance Passed 8/14/25
TEP CLEARANCE: ECO
08/14/2025 COT - RSEL - Grounding/Bonding Passed
08/20/2025 COT - RSBU - Interior Shear Bracing Passed
10/23/2025 COT - RSEL - Electrical Final Passed Passed final 10/23/25
10/23/2025 COT - RSEL - Outdoor Lighting Passed Passed final 10/23/25
10/23/2025 COT - RSME - Mechanical Final Passed Passed final 10/23/25
10/23/2025 COT - RSPL - Plumbing Final Passed Generator installed per plans 10/23/25
10/23/2025 ENGR Engineering Final Passed Site is complete in accordance with approved plans. Engineering is okay for CofO.
10/23/2025 RSBU - Building Final Passed Generator installed per plans 10/23/25
10/23/2025 RSBU - Building Progress Passed Passed final 10/23/25

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_SITEPLAN_V1.PDF DOCUMENTS VIEW
1_SPECIAL INSPECTION CERT-2025-05-02_V1.PDF DOCUMENTS VIEW