Inspection History Details
Inspection Status: Not Ready
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/08/2025 | BULD - Electrical Clearance | Not Ready | Not ready | |
| 08/12/2025 | BULD - Electrical Clearance | Re-inspection required | 8.12.25 Multiple ducts disconnected/vent fixtures not installed |
|
| 08/14/2025 | BULD - Electrical Clearance | Passed | 8/14/25 TEP CLEARANCE: ECO |