Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Address NEW:
7410 S BULLSEYE WY
Apply Date:
01/21/2025
Applicant:
Candis Benson
Description:
Blackhawk B30G New SFR with/AVP (Model master plan TC-MDP-1224-01385), REV1: Sales Office REV1: Conversion of garage into sales office space.

Permit Reviews

Permit Number - TC-MDP-0125-00051
Permit Status: Inspections complete
Permit Description: Blackhawk B30G New SFR with/AVP (Model master plan TC-MDP-1224-01385), REV1: Sales Office REV1: Conversion of garage into sales office space.
Start Date Submittal Complete Date Status  
02/27/2025 SITE FROM MODEL PERMIT - SUBDIVISION REVISION v.2 03/18/2025 APPROVED Review Details
02/07/2025 SITE FROM MODEL PERMIT - SUBDIVISION REVISION v.1 02/18/2025 REQUIRES RESUBMIT Review Details
01/29/2025 SITE FROM MODEL PERMIT - SUBDIVISION v.1 02/05/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0125-00051
Permit Status: Inspections complete
Permit Description: Blackhawk B30G New SFR with/AVP (Model master plan TC-MDP-1224-01385), REV1: Sales Office REV1: Conversion of garage into sales office space.
Total Outstanding Activity Conditions - 6
Date Name
01/28/2025 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
01/29/2025 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
01/29/2025 Post-Installed Anchor Inspection Report is required.
01/29/2025 Post-Tension Inspection Report is required.
01/29/2025 Soils special inspection is required.
02/07/2025 Submit the Air Leakage & Duct Tightness Test Report completed by an Approved Special Inspector prior to Final Inspections.

Conditions

Permit Number - TC-MDP-0125-00051
Permit Status: Inspections complete
Permit Description: Blackhawk B30G New SFR with/AVP (Model master plan TC-MDP-1224-01385), REV1: Sales Office REV1: Conversion of garage into sales office space.
Date Description Comments
01/28/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
01/28/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0125-00051
Permite Description: Blackhawk B30G New SFR with/AVP (Model master plan TC-MDP-1224-01385), REV1: Sales Office REV1: Conversion of garage into sales office space.
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
02/20/2025 COT - RSBU - Preslab N/A Partial Pass 2/19/25 pass

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0125-00051
Permit Description: Blackhawk B30G New SFR with/AVP (Model master plan TC-MDP-1224-01385), REV1: Sales Office REV1: Conversion of garage into sales office space.
Total Completed Inspections - 21
Date Description Inspector Results Comments
02/14/2025 COT - RSPL - Rough Soil Passed Passed inspection 2/14/25 ok to backfill
02/14/2025 COT - RSPL - Sewer Passed Passed inspection 2/14/25 ok to backfill
02/14/2025 COT - RSPL - Yard Water Line Passed Passed inspection 2/14/25 ok to backfill
02/20/2025 COT - RSBU - Excavation/Rebar/Zoning Passed 2/19/25 pass
02/20/2025 COT - RSEL - Electrical Underground Passed 2/19/25 pass
02/20/2025 COT - RSEL - Grounding/Bonding Passed 2/19/25 pass
02/21/2025 BULD - Electrical Clearance Passed 2/21/25 approval for TEP ECO
02/21/2025 COT - RSBU - Preslab Passed 2/21/5 pass
02/27/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
02/27/2025 COT - RSBU - Roof Nailing Passed
03/07/2025 COT - RSPL - Gas Pressure Test Passed 7 March 25
Pass
03/07/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 7 March 25
Pass
03/18/2025 COT - RSBU - Interior Shear Bracing Passed Passed 8/18/25 ok to tape
04/08/2025 COT - BULD - SWG Clearance Passed 08 April 25
SOUTHWEST GAS CLEARANCE: SWG
04/16/2025 COT - RSEL - Electrical Final Passed
04/16/2025 COT - RSEL - Outdoor Lighting Passed
04/16/2025 COT - RSME - Mechanical Final Passed
04/16/2025 COT - RSPL - Plumbing Final Passed
04/16/2025 ENGR Engineering Final Passed
04/16/2025 RSBU - Building Final Passed
04/16/2025 RSBU - Building Progress Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
2_MANUAL J,S,D_V1.PDF DOCUMENTS VIEW
CONS-2_PLAN_SET_V2.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_SITEPLAN_V1.PDF DOCUMENTS VIEW
1_SPECIAL INSPECTION CERT-2025-01-28_V1.PDF DOCUMENTS VIEW