Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Address:
5954 E JAYDEN LN
Address NEW:
5954 E JAYDEN LN
Apply Date:
02/10/2025
Applicant:
Candis Benson
Description:
Blackhawk B30G New SFR with/AVP (Model master plan TC-MDP-1224-01385)

Permit Reviews

Permit Number - TC-MDP-0125-00050
Permit Status: Inspections complete
Permit Description: Blackhawk B30G New SFR with/AVP (Model master plan TC-MDP-1224-01385)
Start Date Submittal Complete Date Status  
02/14/2025 SITE FROM MODEL PERMIT - SUBDIVISION v.1 02/24/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0125-00050
Permit Status: Inspections complete
Permit Description: Blackhawk B30G New SFR with/AVP (Model master plan TC-MDP-1224-01385)
Total Outstanding Activity Conditions - 1
Date Name
01/28/2025 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/

Conditions

Permit Number - TC-MDP-0125-00050
Permit Status: Inspections complete
Permit Description: Blackhawk B30G New SFR with/AVP (Model master plan TC-MDP-1224-01385)
Date Description Comments
01/28/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
01/28/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0125-00050
Permite Description: Blackhawk B30G New SFR with/AVP (Model master plan TC-MDP-1224-01385)
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
03/20/2025 COT - RSPL - Rough Soil N/A Re-inspection required 3-20-25, per Contractor, underground plumbing, main water line, and sewer was installed per plans and was holding pressure. However, progress areas were backfilled accidentally. Contractor was given 3 options; submit a letter to the city for review stating construction was done per approved plans and meets the 2018 International Residential Code, uncover work and reschedule or run "snake" in system to verify slope/proper fittings. Contractor will submit the letter and is okay to continue construction at own risk.
03/20/2025 COT - RSPL - Sewer N/A Re-inspection required 3-20-25, per Contractor, underground plumbing, main water line, and sewer was installed per plans and was holding pressure. However, progress areas were backfilled accidentally. Contractor was given 3 options; submit a letter to the city for review stating construction was done per approved plans and meets the 2018 International Residential Code, uncover work and reschedule or run "snake" in system to verify slope/proper fittings. Contractor will submit the letter and is okay to continue construction at own risk.
03/20/2025 COT - RSPL - Yard Water Line N/A Re-inspection required 3-20-25, per Contractor, underground plumbing, main water line, and sewer was installed per plans and was holding pressure. However, progress areas were backfilled accidentally. Contractor was given 3 options; submit a letter to the city for review stating construction was done per approved plans and meets the 2018 International Residential Code, uncover work and reschedule or run "snake" in system to verify slope/proper fittings. Contractor will submit the letter and is okay to continue construction at own risk.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0125-00050
Permit Description: Blackhawk B30G New SFR with/AVP (Model master plan TC-MDP-1224-01385)
Total Completed Inspections - 21
Date Description Inspector Results Comments
03/25/2025 COT - RSBU - Excavation/Rebar/Zoning Passed Passed 3/25/25 ok to pour concrete
03/25/2025 BULD - Electrical Clearance Passed Passed 3/25/25 ready for temp power CLEARANCE ECO
03/25/2025 COT - RSBU - Preslab Passed Passed 3/25/25 ok to pour concrete
03/25/2025 COT - RSEL - Electrical Underground Passed Passed 3/25/25 ok to pour concrete
04/04/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
04/04/2025 COT - RSBU - Roof Nailing Passed
04/17/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
04/17/2025 COT - RSEL - Grounding/Bonding Passed
04/17/2025 COT - RSPL - Gas Pressure Test Passed
04/18/2025 COT - RSPL - Rough Soil Passed 4/17/25
Pass, proceed at own risk.
04/18/2025 COT - RSPL - Sewer Passed 4/17/25
Pass, proceed at own risk.
04/18/2025 COT - RSPL - Yard Water Line Passed 4/17/25
Pass, proceed at own risk.
05/01/2025 COT - RSBU - Interior Shear Bracing Passed
06/02/2025 COT - BULD - SWG Clearance Passed 6-2-25: okay for SWG to install meter. Clearance issued.
06/11/2025 COT - RSEL - Electrical Final Passed 6-11-25: outdoor lighting, electrical, mechanical, plumbing, and building final approved.
06/11/2025 COT - RSME - Mechanical Final Passed 6-11-25: outdoor lighting, electrical, mechanical, plumbing, and building final approved.
06/11/2025 COT - RSPL - Plumbing Final Passed 6-11-25: outdoor lighting, electrical, mechanical, plumbing, and building final approved.
06/10/2025 ENGR Engineering Final Passed CO Ready
06/11/2025 COT - RSEL - Outdoor Lighting Passed 6-11-25: outdoor lighting, electrical, mechanical, plumbing, and building final approved.
06/11/2025 RSBU - Building Progress Passed
06/11/2025 RSBU - Building Final Passed 6-11-25: outdoor lighting, electrical, mechanical, plumbing, and building final approved.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_SITEPLAN_V1.PDF DOCUMENTS VIEW
1_SPECIAL INSPECTION CERT-2025-02-10_V1.PDF DOCUMENTS VIEW