Permit: TC-MDP-0125-00050
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
5954 E JAYDEN LN
Address NEW:
5954 E JAYDEN LN
Apply Date:
02/10/2025
Applicant:
Candis Benson
Description:
Blackhawk B30G New SFR with/AVP (Model master plan TC-MDP-1224-01385)
Permit Reviews
Permit Number - TC-MDP-0125-00050
Permit Status: Inspections complete
Permit Description: Blackhawk B30G New SFR with/AVP (Model master plan TC-MDP-1224-01385)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/14/2025 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 02/24/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0125-00050
Permit Status: Inspections complete
Permit Description: Blackhawk B30G New SFR with/AVP (Model master plan TC-MDP-1224-01385)
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 01/28/2025 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ |
Conditions
Permit Number - TC-MDP-0125-00050
Permit Status: Inspections complete
Permit Description: Blackhawk B30G New SFR with/AVP (Model master plan TC-MDP-1224-01385)
| Date | Description | Comments |
|---|---|---|
| 01/28/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 01/28/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0125-00050
Permite Description: Blackhawk B30G New SFR with/AVP (Model master plan TC-MDP-1224-01385)
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/20/2025 | COT - RSPL - Rough Soil | N/A | Re-inspection required | 3-20-25, per Contractor, underground plumbing, main water line, and sewer was installed per plans and was holding pressure. However, progress areas were backfilled accidentally. Contractor was given 3 options; submit a letter to the city for review stating construction was done per approved plans and meets the 2018 International Residential Code, uncover work and reschedule or run "snake" in system to verify slope/proper fittings. Contractor will submit the letter and is okay to continue construction at own risk. |
| 03/20/2025 | COT - RSPL - Sewer | N/A | Re-inspection required | 3-20-25, per Contractor, underground plumbing, main water line, and sewer was installed per plans and was holding pressure. However, progress areas were backfilled accidentally. Contractor was given 3 options; submit a letter to the city for review stating construction was done per approved plans and meets the 2018 International Residential Code, uncover work and reschedule or run "snake" in system to verify slope/proper fittings. Contractor will submit the letter and is okay to continue construction at own risk. |
| 03/20/2025 | COT - RSPL - Yard Water Line | N/A | Re-inspection required | 3-20-25, per Contractor, underground plumbing, main water line, and sewer was installed per plans and was holding pressure. However, progress areas were backfilled accidentally. Contractor was given 3 options; submit a letter to the city for review stating construction was done per approved plans and meets the 2018 International Residential Code, uncover work and reschedule or run "snake" in system to verify slope/proper fittings. Contractor will submit the letter and is okay to continue construction at own risk. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0125-00050
Permit Description: Blackhawk B30G New SFR with/AVP (Model master plan TC-MDP-1224-01385)
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/25/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Passed 3/25/25 ok to pour concrete | |
| 03/25/2025 | BULD - Electrical Clearance | Passed | Passed 3/25/25 ready for temp power CLEARANCE ECO | |
| 03/25/2025 | COT - RSBU - Preslab | Passed | Passed 3/25/25 ok to pour concrete | |
| 03/25/2025 | COT - RSEL - Electrical Underground | Passed | Passed 3/25/25 ok to pour concrete | |
| 04/04/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 04/04/2025 | COT - RSBU - Roof Nailing | Passed | ||
| 04/17/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 04/17/2025 | COT - RSEL - Grounding/Bonding | Passed | ||
| 04/17/2025 | COT - RSPL - Gas Pressure Test | Passed | ||
| 04/18/2025 | COT - RSPL - Rough Soil | Passed | 4/17/25 Pass, proceed at own risk. |
|
| 04/18/2025 | COT - RSPL - Sewer | Passed | 4/17/25 Pass, proceed at own risk. |
|
| 04/18/2025 | COT - RSPL - Yard Water Line | Passed | 4/17/25 Pass, proceed at own risk. |
|
| 05/01/2025 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 06/02/2025 | COT - BULD - SWG Clearance | Passed | 6-2-25: okay for SWG to install meter. Clearance issued. | |
| 06/11/2025 | COT - RSEL - Electrical Final | Passed | 6-11-25: outdoor lighting, electrical, mechanical, plumbing, and building final approved. | |
| 06/11/2025 | COT - RSME - Mechanical Final | Passed | 6-11-25: outdoor lighting, electrical, mechanical, plumbing, and building final approved. | |
| 06/11/2025 | COT - RSPL - Plumbing Final | Passed | 6-11-25: outdoor lighting, electrical, mechanical, plumbing, and building final approved. | |
| 06/10/2025 | ENGR Engineering Final | Passed | CO Ready | |
| 06/11/2025 | COT - RSEL - Outdoor Lighting | Passed | 6-11-25: outdoor lighting, electrical, mechanical, plumbing, and building final approved. | |
| 06/11/2025 | RSBU - Building Progress | Passed | ||
| 06/11/2025 | RSBU - Building Final | Passed | 6-11-25: outdoor lighting, electrical, mechanical, plumbing, and building final approved. |