Permit: TC-MDP-0125-00021
Permit Details
Status:
Inspections
Type:
Model Building Permit
Address:
7332 S AVENIDA OBELO
Address NEW:
7332 S AVENIDA OBELO
Apply Date:
01/15/2025
Applicant:
Brianna Quiroz
Description:
Harding SFR Model La Estancia (roof vent update) (Model master plan TC-MDP-0123-00365)
Permit Reviews
Permit Number - TC-MDP-0125-00021
Permit Status: Inspections
Permit Description: Harding SFR Model La Estancia (roof vent update) (Model master plan TC-MDP-0123-00365)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 11/24/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 11/25/2025 | APPROVED |
| 05/27/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 05/27/2025 | REQUIRES RESUBMIT |
| 04/04/2025 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 04/14/2025 | APPROVED |
Conditions
Permit Number - TC-MDP-0125-00021
Permit Status: Inspections
Permit Description: Harding SFR Model La Estancia (roof vent update) (Model master plan TC-MDP-0123-00365)
| Date | Description | Comments |
|---|---|---|
| 01/17/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 04/13/2025 | Post-Installed Anchor Inspection Report is required. | |
| 04/13/2025 | Post-Tension Inspection Report is required. | |
| 01/17/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 01/17/2025 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
| 04/13/2025 | Soil Compaction Special Inspection is Required. | |
| 04/13/2025 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-MDP-0125-00021
Permite Description: Harding SFR Model La Estancia (roof vent update) (Model master plan TC-MDP-0123-00365)
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/03/2025 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
| 07/03/2025 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-MDP-0125-00021
Permit Description: Harding SFR Model La Estancia (roof vent update) (Model master plan TC-MDP-0123-00365)
Total Completed Inspections - 13
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/03/2025 | COT - RSPL - Backwater Valve | Passed | ||
| 07/03/2025 | COT - RSPL - Rough Soil | Passed | Plans call for a 3" line to the lav. Plans will be revised. Okay to backfill progress areas. Shading material is required. 7/3/2025 | |
| 07/03/2025 | COT - RSPL - Sewer | Passed | Plans call for a 3" line to the lav. Plans will be revised. Okay to backfill progress areas. Shading material is required. 7/3/2025 | |
| 07/03/2025 | COT - RSPL - Yard Water Line | Passed | ||
| 07/09/2025 | COT - RSEL - Electrical Underground | Passed | 7-9-25: electrical underground approved. | |
| 07/09/2025 | COT - RSBU - Preslab | Passed | 7-9-25: preslab, excavation/reinforcement and setbacks verified per plans. Okay to pour concrete. | |
| 07/09/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 7-9-25: excavation/reinforcement and setbacks verified per plans. Okay to pour concrete. | |
| 07/25/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 7/25/25 Pass |
|
| 07/25/2025 | COT - RSBU - Roof Nailing | Passed | 7/25/25 Pass |
|
| 07/29/2025 | COT - RSEL - Grounding/Bonding | Passed | 7.29.25 bonding verified |
|
| 08/20/2025 | BULD - Electrical Clearance | Passed | 7.29.25 Passed, proceed 8/20/25: ECO TEP CLEARANCE |
|
| 08/25/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 09/24/2025 | COT - RSBU - Interior Shear Bracing | Passed |