Inspection History Details
Inspection Status: Passed
Inspection History: COT - RSPL - Rough SoilÂ
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/03/2025 | COT - RSPL - Rough Soil | Passed | Plans call for a 3" line to the lav. Plans will be revised. Okay to backfill progress areas. Shading material is required. 7/3/2025 |