Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
12/05/2022
Applicant:
Brandon Kempel
Description:
SFR RKM45R T21-M0093 (REVISION Delta 4) (Model master plan TC-MDP-1222-00031)

Permit Reviews

Permit Number - TC-MDP-0125-00005
Permit Status: Inspections complete
Permit Description: SFR RKM45R T21-M0093 (REVISION Delta 4) (Model master plan TC-MDP-1222-00031)
Start Date Submittal Complete Date Status  
02/05/2025 SITE FROM MODEL PERMIT - PRODUCTION v.2 02/05/2025 APPROVED Review Details
01/16/2025 SITE FROM MODEL PERMIT - PRODUCTION v.1 02/04/2025 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0125-00005
Permit Status: Inspections complete
Permit Description: SFR RKM45R T21-M0093 (REVISION Delta 4) (Model master plan TC-MDP-1222-00031)
Total Outstanding Activity Conditions - 5
Date Name
01/10/2025 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
01/27/2025 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
01/27/2025 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
01/27/2025 Post-Tension Inspection Report is required.
01/27/2025 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.

Conditions

Permit Number - TC-MDP-0125-00005
Permit Status: Inspections complete
Permit Description: SFR RKM45R T21-M0093 (REVISION Delta 4) (Model master plan TC-MDP-1222-00031)
Date Description Comments
01/16/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
01/10/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0125-00005
Permit Description: SFR RKM45R T21-M0093 (REVISION Delta 4) (Model master plan TC-MDP-1222-00031)
Total Completed Inspections - 21
Date Description Inspector Results Comments
04/01/2025 COT - RSPL - Sewer Passed
04/01/2025 COT - RSPL - Rough Soil Passed
04/01/2025 COT - RSPL - Yard Water Line Passed
04/07/2025 COT - RSBU - Excavation/Rebar/Zoning Passed
04/07/2025 COT - RSBU - Preslab Passed
04/07/2025 COT - RSEL - Electrical Underground Passed
05/01/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 4/29/25: Roof sheathing must be properly fastened at bedroom, straps at beam to post connection must be fastened per plan, shear wall fasteners not per plan, fasteners must be 3/8" from edge , MASA clips must have 7 nail minimum to suffice for a 1/2" anchor bolt
5/1/25: (4) MASA CLIPS MISSING MARKED ON SILL PLATE, (2) at back porch S.G.D and (2) at entry. Verify at intermediate inspection
05/01/2025 COT - RSBU - Roof Nailing Passed
05/19/2025 COT - RSEL - Grounding/Bonding Passed 5/19/25 passed
05/19/2025 BULD - Electrical Clearance Passed 5/19/25 passed CLEARANCE ECO
05/20/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 5/20/25 corrections made
05/20/2025 COT - RSPL - Gas Pressure Test Passed Passed 5/20/25 corrections made
05/30/2025 COT - RSBU - Interior Shear Bracing Passed 5-30-25: interior shear bracing approved. Okay to tape & texture
07/14/2025 COT - BULD - SWG Clearance Passed Emailed by JConrad on 07/17/25
07/25/2025 COT - RSEL - Electrical Final Passed
07/25/2025 COT - RSEL - Outdoor Lighting Passed
07/25/2025 COT - RSME - Mechanical Final Passed
07/25/2025 COT - RSPL - Plumbing Final Passed
07/25/2025 ENGR Engineering Final Passed Everything is in accordance with approved plans.
07/25/2025 RSBU - Building Final Passed
07/25/2025 RSBU - Building Progress Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
2_SITEPLAN_V2.PDF DOCUMENTS VIEW