Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
12/05/2022
Applicant:
Brandon Kempel
Description:
SFR RKM45R T21-M0093 (REVISION Delta 4) (Model master plan TC-MDP-1222-00031)

Permit Reviews

Permit Number - TC-MDP-0125-00004
Permit Status: Inspections complete
Permit Description: SFR RKM45R T21-M0093 (REVISION Delta 4) (Model master plan TC-MDP-1222-00031)
Start Date Submittal Complete Date Status  
01/16/2025 SITE FROM MODEL PERMIT - PRODUCTION v.1 01/31/2025 REQUIRES RESUBMIT Review Details
02/05/2025 SITE FROM MODEL PERMIT - PRODUCTION v.2 02/05/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0125-00004
Permit Status: Inspections complete
Permit Description: SFR RKM45R T21-M0093 (REVISION Delta 4) (Model master plan TC-MDP-1222-00031)
Total Outstanding Activity Conditions - 5
Date Name
01/10/2025 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
01/17/2025 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
01/17/2025 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
01/17/2025 Post-Tension Inspection Report is required.
01/17/2025 Soils

Conditions

Permit Number - TC-MDP-0125-00004
Permit Status: Inspections complete
Permit Description: SFR RKM45R T21-M0093 (REVISION Delta 4) (Model master plan TC-MDP-1222-00031)
Date Description Comments
02/05/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
01/10/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0125-00004
Permite Description: SFR RKM45R T21-M0093 (REVISION Delta 4) (Model master plan TC-MDP-1222-00031)
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
07/03/2025 COT - RSME - Mechanical Final N/A Failed 7/3/25 air handler in attic not labeled with heat kit or indicated which one installed.
07/03/2025 RSBU - Building Final N/A Failed 7/3/25
Missing post tension tag at water main.
Hot water line in garage needs insulation.
Switch in attic not working, needs bulb.
Air handler in attic not labeled with gas heat kit.
07/03/2025 COT - RSPL - Plumbing Final N/A Failed 7/3/25 Hot water line in garage needs insulation.
07/03/2025 COT - RSEL - Electrical Final N/A Failed 7/3/25
Missing post tension tag at water main or electrical panel.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0125-00004
Permit Description: SFR RKM45R T21-M0093 (REVISION Delta 4) (Model master plan TC-MDP-1222-00031)
Total Completed Inspections - 21
Date Description Inspector Results Comments
02/27/2025 COT - RSPL - Yard Water Line Passed
02/27/2025 COT - RSPL - Sewer Passed
02/27/2025 COT - RSPL - Rough Soil Passed
03/10/2025 COT - RSEL - Grounding/Bonding Passed 10 March 25
Pass
03/10/2025 COT - RSBU - Preslab Passed 10 March 25
Pass
03/10/2025 COT - RSEL - Electrical Underground Passed 10 March 25
Pass
03/10/2025 COT - RSBU - Excavation/Rebar/Zoning Passed 10 March 25
Pass
03/27/2025 COT - RSBU - Roof Nailing Passed
03/27/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
04/24/2025 BULD - Electrical Clearance Passed Passed 4/24/25 CLEARANCE ECO
04/24/2025 COT - RSPL - Gas Pressure Test Passed Passed 4/24/25 held pressure
04/25/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 4-25-25, residential intermediate inspection approved. Okay to continue with construction.
05/07/2025 COT - RSBU - Interior Shear Bracing Passed 5/7/25 passed
06/27/2025 COT - BULD - SWG Clearance Passed Clearance for Southwest Gas. 6/27/2025
07/03/2025 COT - RSEL - Outdoor Lighting Passed
07/03/2025 RSBU - Building Progress Passed
07/09/2025 COT - RSME - Mechanical Final Passed Passed final 7/9/25
07/09/2025 RSBU - Building Final Passed Passed final 7/9/25
07/09/2025 ENGR Engineering Final Passed
07/09/2025 COT - RSPL - Plumbing Final Passed Passed final 7/9/25
07/09/2025 COT - RSEL - Electrical Final Passed Passed final 7/9/25

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
2_SITEPLAN_V2.PDF DOCUMENTS VIEW