Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 07/03/2025 |
ENGR Engineering Final
|
|
Not Ready |
Clean outs need to be cut down to proper hgt. And collars need to be glued in place on anything larger than 2". This is to prevent the backup of black water from creating an environmental hazard if there is a backup. This will be from here on out a definite failure on the inspection report. |
| 07/09/2025 |
ENGR Engineering Final
|
|
Passed |
|