Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
01/17/2024
Applicant:
Celina Rodriguez
Description:
SFR BT1262-130 T22-M0016

Permit Reviews

Permit Number - TC-MDP-0124-00100
Permit Status: Inspections complete
Permit Description: SFR BT1262-130 T22-M0016
Start Date Submittal Complete Date Status  
01/29/2025 SITE FROM MODEL PERMIT - SUBDIVISION v.1 02/05/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0124-00100
Permit Status: Inspections complete
Permit Description: SFR BT1262-130 T22-M0016
Total Outstanding Activity Conditions - 4
Date Name
01/17/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
01/29/2025 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
01/29/2025 Post-Installed Anchor Inspection Report is required.
01/29/2025 Post-Tension Inspection Report is required.

Conditions

Permit Number - TC-MDP-0124-00100
Permit Status: Inspections complete
Permit Description: SFR BT1262-130 T22-M0016
Date Description Comments
01/29/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
01/17/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0124-00100
Permite Description: SFR BT1262-130 T22-M0016
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
02/14/2025 COT - RSEL - Grounding/Bonding N/A Partial Pass Okay to pour concrete. Forms are set, post tension cabling is evenly spaced, shear wall and masa clips are attached to form where required, underground electrical is installed for kitchen island, all underground plumbing is properly wrapped, and rebar is installed for Ufer ground.
02/28/2025 COT - RSBU - Roof Nailing N/A Re-inspection required 28 FEB 25
1. Shot pins are missing in interiors walls, within 6" of every edge.
2. Truss A1E is missing lateral bracing, just south of first brace.
02/26/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing N/A Re-inspection required 2/26/25: RSP4 at south wall near entry must be properly fastened, At sill plates greater than 12" (2) Anchor bolts required, Anchor bolt required 12" from edge of sill plate, At shear wall 11 and greater 3"x3" washer plates required. STOPPED INSPECTION MORE ITEMS MAY BE ADDED

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0124-00100
Permit Description: SFR BT1262-130 T22-M0016
Total Completed Inspections - 21
Date Description Inspector Results Comments
02/11/2025 COT - RSPL - Rough Soil Passed Passed 2/11/25 ok to backfill
02/11/2025 COT - RSPL - Sewer Passed Passed 2/11/25 ok to backfill
02/11/2025 COT - RSPL - Yard Water Line Passed Passed 2/11/25 ok to backfill
02/14/2025 COT - RSBU - Excavation/Rebar/Zoning Passed Okay to pour concrete. Forms are set, post tension cabling is evenly spaced, shear wall and masa clips are attached to form where required, underground electrical is installed for kitchen island, all underground plumbing is properly wrapped, and rebar is installed for Ufer ground.
02/14/2025 COT - RSBU - Preslab Passed Okay to pour concrete. Forms are set, post tension cabling is evenly spaced, shear wall and masa clips are attached to form where required, underground electrical is installed for kitchen island, all underground plumbing is properly wrapped, and rebar is installed for Ufer ground.
02/14/2025 COT - RSEL - Electrical Underground Passed Okay to pour concrete. Forms are set, post tension cabling is evenly spaced, shear wall and masa clips are attached to form where required, underground electrical is installed for kitchen island, all underground plumbing is properly wrapped, and rebar is installed for Ufer ground.
02/28/2025 COT - RSEL - Grounding/Bonding Passed 28 FEB 25
Pass
03/03/2025 COT - RSBU - Roof Nailing Passed 3 March 25
Pass
03/03/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 3 MAR 25
ALL CORRECTIONS HAVE BEEN MADE.
03/10/2025 BULD - Electrical Clearance Passed 10 MAR 25
TEP CLEARANCE: ECO
03/20/2025 COT - RSPL - Gas Pressure Test Passed
03/25/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 3/25/25 corrections made
04/07/2025 COT - RSBU - Interior Shear Bracing Passed Passed 4/7/25 ok to tape
05/12/2025 COT - BULD - SWG Clearance Passed 5/12/25
SOUTHWEST GAS CLEARANCE: SWG
05/19/2025 COT - RSEL - Electrical Final Passed passed final 5/19/25
05/19/2025 COT - RSEL - Outdoor Lighting Passed passed final 5/19/25
05/19/2025 COT - RSME - Mechanical Final Passed passed final 5/19/25
05/19/2025 COT - RSPL - Plumbing Final Passed passed final 5/19/25
05/19/2025 RSBU - Building Final Passed passed final 5/19/25
05/19/2025 RSBU - Building Progress Passed passed final 5/19/25
05/22/2025 ENGR Engineering Final Passed Flatwork is complete, site is in accordance with approved plans. CofO ready.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BELLA TIERRA PHASE 3 - LOT 64 START_V1.PDF DOCUMENTS VIEW
BTIII 64 SIC-2025-01-24_V1.PDF DOCUMENTS VIEW