Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
05/24/2024
Applicant:
Celina Rodriguez
Description:
SFR BT1262-130 T22-M0016

Permit Reviews

Permit Number - TC-MDP-0124-00098
Permit Status: Inspections complete
Permit Description: SFR BT1262-130 T22-M0016
Start Date Submittal Complete Date Status  
05/24/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 05/29/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0124-00098
Permit Status: Inspections complete
Permit Description: SFR BT1262-130 T22-M0016
Total Outstanding Activity Conditions - 5
Date Name
01/17/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
05/29/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
05/29/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
05/29/2024 Post-Tension Inspection Report is required.
05/29/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Conditions

Permit Number - TC-MDP-0124-00098
Permit Status: Inspections complete
Permit Description: SFR BT1262-130 T22-M0016
Date Description Comments
01/17/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0124-00098
Permite Description: SFR BT1262-130 T22-M0016
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
10/22/2024 COT - BULD - SWG Clearance N/A Re-inspection required could not enter home 10/22/24

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0124-00098
Permit Description: SFR BT1262-130 T22-M0016
Total Completed Inspections - 22
Date Description Inspector Results Comments
06/11/2024 COT - RSPL - Backwater Valve Passed
06/11/2024 COT - RSPL - Rough Soil Passed
06/11/2024 COT - RSPL - Yard Water Line Passed
06/21/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
06/21/2024 COT - RSBU - Preslab Passed
06/21/2024 COT - RSEL - Electrical Underground Passed
06/21/2024 COT - RSEL - Grounding/Bonding Passed
07/26/2024 COT - RSBU - Roof Nailing Passed Roof trusses are properly installed and secured to top plate with nails and H2.5 clips. Roof sheathing is properly installed and secured to roof trusses with nails per plan and code.
07/26/2024 COT - RSBU - Exterior Clips/Sheathing Passed Bottom plates are properly screwed to concrete floors with masa clips, shot pins, pour in place bolts, or titanium bolts. Exterior sheathing is properly installed and secured to studs with nails per plan requirements, shear wall hold downs are installed and properly nailed to studs and sheathing. Okay to proceed with rough-in.
08/13/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
08/13/2024 COT - RSPL - Gas Pressure Test Passed
08/15/2024 RSBU - Building Progress Passed
08/27/2024 COT - RSBU - Interior Shear Bracing Passed
09/16/2024 BULD - Electrical Clearance Passed Passes electrical clearance ECO 9/16/2024
10/01/2024 COT - RSPL - Sewer Passed
10/23/2024 COT - BULD - SWG Clearance Passed 10-23-24: Gas valves are installed in kitchen, attic, and garage for gas appliances. SWG Clearance issued.
11/13/2024 COT - RSEL - Outdoor Lighting Passed passed
11/13/2024 COT - RSEL - Electrical Final Passed passed
11/13/2024 COT - RSME - Mechanical Final Passed passed
11/13/2024 COT - RSPL - Plumbing Final Passed passed
11/13/2024 RSBU - Building Final Passed passed
11/15/2024 ENGR Engineering Final Passed