Permit: TC-MDP-0124-00097
Permit Details
Apply Date:
01/17/2024
Applicant:
Celina Rodriguez
Description:
SFR BT1262-130 T22-M0016
Permit Reviews
Permit Number - TC-MDP-0124-00097
Permit Status: Inspections complete
Permit Description: SFR BT1262-130 T22-M0016
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
03/13/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 03/22/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0124-00097
Permit Status: Inspections complete
Permit Description: SFR BT1262-130 T22-M0016
Total Outstanding Activity Conditions - 6
Date | Name |
---|---|
01/17/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
03/22/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
03/22/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
03/22/2024 | Post-Tension Inspection Report is required. |
03/22/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
11/22/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
Conditions
Permit Number - TC-MDP-0124-00097
Permit Status: Inspections complete
Permit Description: SFR BT1262-130 T22-M0016
Date | Description | Comments |
---|---|---|
01/17/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
11/22/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0124-00097
Permit Description: SFR BT1262-130 T22-M0016
Total Completed Inspections - 21
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/12/2024 | COT - RSPL - Rough Soil | Passed | ||
04/12/2024 | COT - RSPL - Yard Water Line | Passed | ||
04/24/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Concrete forms are set in place, post tension cabling is properly installed and spaced per plans, rebar reinforcement is installed per plans. All plumbing pipes are properly wrapped with foam and tub/shower have plastic boxes around pipe. Simpson masa clips and shear wall clips are installed per plan. Rebar reinforcement 20' long is installed for a Ufer ground in bottom of footing on left side of house. Okay to pour concrete for slab and footings. | |
04/24/2024 | COT - RSBU - Preslab | Passed | Concrete forms are set in place, post tension cabling is properly installed and spaced per plans, rebar reinforcement is installed per plans. All plumbing pipes are properly wrapped with foam and tub/shower have plastic boxes around pipe. Simpson masa clips and shear wall clips are installed per plan. Rebar reinforcement 20' long is installed for a Ufer ground in bottom of footing on left side of house. Okay to pour concrete for slab and footings. | |
04/24/2024 | COT - RSEL - Electrical Underground | Passed | Peninsula counter top, no underground electrical required. | |
04/24/2024 | COT - RSEL - Grounding/Bonding | Passed | Concrete forms are set in place, post tension cabling is properly installed and spaced per plans, rebar reinforcement is installed per plans. All plumbing pipes are properly wrapped with foam and tub/shower have plastic boxes around pipe. Simpson masa clips and shear wall clips are installed per plan. Rebar reinforcement 20' long is installed for a Ufer ground in bottom of footing on left side of house. Okay to pour concrete for slab and footings. | |
06/12/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | Plywood sheathing for exterior shear walls is properly secured to studs per plan requirements. All masa clips and shear wall hold downs are properly nailed to bottom plates and wall studs. Bottom plates are secured with cut nails, titan bolts, or j-bolts. Okay to proceed with plumbing top out. | |
06/12/2024 | COT - RSBU - Roof Nailing | Passed | Roof trusses are properly secured to top plate with nails and H2.5 hurricane ties. Plywood sheathing is securely attached to trusses with nails per plan. Okay to proceed with plumbing top out. | |
07/19/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
07/31/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Corrections were made 7/31/2024 | |
08/06/2024 | BULD - Electrical Clearance | Passed | TEP ECO | |
08/07/2024 | COT - RSBU - Interior Shear Bracing | Passed | Drywall for interior shear walls is properly installed and secured to the studs with screws per plan requirements. Okay to proceed with tape, texture, and paint of all walls and ceilings. | |
09/09/2024 | COT - RSPL - Sewer | Passed | Sewer line is properly connected to underground plumbing. Okay to shade pipe and backfill trench. | |
10/08/2024 | COT - BULD - SWG Clearance | Passed | SWG FOR METER CONNECTION ONLY | |
10/25/2024 | COT - RSEL - Electrical Final | Passed | Construction is completed per plans. Okay to issue Certificate of Occupancy. | |
10/25/2024 | COT - RSEL - Outdoor Lighting | Passed | Outdoor lighting is installed and operational per plan and city requirements. | |
10/25/2024 | COT - RSME - Mechanical Final | Passed | Construction is completed per plans. Okay to issue Certificate of Occupancy. | |
10/25/2024 | COT - RSPL - Plumbing Final | Passed | Construction is completed per plans. Okay to issue Certificate of Occupancy. | |
10/25/2024 | RSBU - Building Final | Passed | Construction is completed per plans. Okay to issue Certificate of Occupancy. | |
10/25/2024 | RSBU - Building Progress | Passed | Construction is completed per plans. Okay to issue Certificate of Occupancy. | |
10/28/2024 | ENGR Engineering Final | Passed |