Inspection Status: Passed
Inspection History: COT - RSEL - Grounding/BondingĀ
| Date |
Description |
Inspector |
Results |
Comments |
| 04/24/2024 |
COT - RSEL - Grounding/BondingĀ |
|
Passed |
Concrete forms are set in place, post tension cabling is properly installed and spaced per plans, rebar reinforcement is installed per plans. All plumbing pipes are properly wrapped with foam and tub/shower have plastic boxes around pipe. Simpson masa clips and shear wall clips are installed per plan. Rebar reinforcement 20' long is installed for a Ufer ground in bottom of footing on left side of house. Okay to pour concrete for slab and footings. |