Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
01/17/2024
Applicant:
Celina Rodriguez
Description:
SFR BT1262-130 T22-M0016

Permit Reviews

Permit Number - TC-MDP-0124-00096
Permit Status: Inspections complete
Permit Description: SFR BT1262-130 T22-M0016
Start Date Submittal Complete Date Status  
01/18/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 01/24/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0124-00096
Permit Status: Inspections complete
Permit Description: SFR BT1262-130 T22-M0016
Total Outstanding Activity Conditions - 5
Date Name
01/17/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
01/18/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
01/18/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
01/22/2024 Post-Tension Inspection Report is required.
01/22/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Conditions

Permit Number - TC-MDP-0124-00096
Permit Status: Inspections complete
Permit Description: SFR BT1262-130 T22-M0016
Date Description Comments
01/17/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0124-00096
Permite Description: SFR BT1262-130 T22-M0016
Total Outstanding Inspections - 2

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0124-00096
Permit Description: SFR BT1262-130 T22-M0016
Total Completed Inspections - 20
Date Description Inspector Results Comments
01/29/2024 COT - RSPL - Yard Water Line Passed
01/29/2024 COT - RSPL - Rough Soil Passed
01/29/2024 COT - RSPL - Sewer Passed
02/05/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
02/05/2024 COT - RSBU - Preslab Passed
02/05/2024 COT - RSEL - Grounding/Bonding Passed
03/04/2024 COT - RSBU - Exterior Clips/Sheathing Passed 3/4/24: all corrections made
03/04/2024 COT - RSBU - Roof Nailing Passed
03/28/2024 COT - RSPL - Gas Pressure Test Passed
04/05/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 4/5/24: Missing registers and ductwork have been installed. Mechanical, electrical, and plumbing rough-in is complete. Okay to proceed with installation of insulation and drywall.
04/10/2024 BULD - Electrical Clearance Passed TEP ECO
04/18/2024 COT - RSBU - Interior Shear Bracing Passed
06/11/2024 COT - BULD - SWG Clearance Passed SWG for meter only
06/28/2024 COT - RSEL - Electrical Final Passed Construction is completed. Mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled and AFCI/GFCI Breakers are installed for bedrooms, kitchen, bathrooms, laundry, exterior outlets and garage outlets. Okay to issue Certificate of Occupancy once all other inspections are completed.
06/28/2024 COT - RSEL - Outdoor Lighting Passed Outdoor lighting is properly installed per plan requirements. Okay to issue Certificate of Occupancy.
06/28/2024 COT - RSME - Mechanical Final Passed Construction is completed. Mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled and AFCI/GFCI Breakers are installed for bedrooms, kitchen, bathrooms, laundry, exterior outlets and garage outlets. Okay to issue Certificate of Occupancy once all other inspections are completed.
06/28/2024 COT - RSPL - Plumbing Final Passed Construction is completed. Mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled and AFCI/GFCI Breakers are installed for bedrooms, kitchen, bathrooms, laundry, exterior outlets and garage outlets. Okay to issue Certificate of Occupancy once all other inspections are completed.
06/28/2024 ENGR Engineering Final Passed
06/28/2024 RSBU - Building Final Passed Construction is completed. Mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled and AFCI/GFCI Breakers are installed for bedrooms, kitchen, bathrooms, laundry, exterior outlets and garage outlets. Okay to issue Certificate of Occupancy once all other inspections are completed.
06/28/2024 RSBU - Building Progress Passed Construction is completed. Mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled and AFCI/GFCI Breakers are installed for bedrooms, kitchen, bathrooms, laundry, exterior outlets and garage outlets. Okay to issue Certificate of Occupancy once all other inspections are completed.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BELLA TIERRA PHASE 2 - LOT 70 START_V1.PDF DOCUMENTS VIEW
BTII 70 SIC-2024-01-17_V1.PDF DOCUMENTS VIEW