Permit: TC-MDP-0124-00092
Permit Details
Apply Date:
01/30/2024
Applicant:
Celina Rodriguez
Description:
SFR BT1262-130 T22-M0016
Permit Reviews
Permit Number - TC-MDP-0124-00092
Permit Status: Inspections complete
Permit Description: SFR BT1262-130 T22-M0016
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/30/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 02/02/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0124-00092
Permit Status: Inspections complete
Permit Description: SFR BT1262-130 T22-M0016
Total Outstanding Activity Conditions - 7
Date | Name |
---|---|
01/17/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
01/30/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
01/30/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
01/30/2024 | Post-Installed Anchor Inspection Report is required. |
02/01/2024 | Post-Tension Inspection Report is required. |
02/01/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
11/22/2023 | THIS DOES NOT APPLY |
Conditions
Permit Number - TC-MDP-0124-00092
Permit Status: Inspections complete
Permit Description: SFR BT1262-130 T22-M0016
Date | Description | Comments |
---|---|---|
01/17/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
11/22/2023 | THIS DOES NOT APPLY |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0124-00092
Permit Description: SFR BT1262-130 T22-M0016
Total Completed Inspections - 21
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/01/2024 | COT - RSPL - Rough Soil | Passed | ||
03/13/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Post-tension cabling is properly installed and spaced per plans, additional rebar reinforcement is in place as required, Ufer ground is in footing for exterior garage wall, and forms are set for a monolithic concrete pour. Okay to proceed with concrete pour. | |
03/13/2024 | COT - RSBU - Preslab | Passed | Post-tension cabling is properly installed and spaced per plans, additional rebar reinforcement is in place as required, Ufer ground is in footing for exterior garage wall, and forms are set for a monolithic concrete pour. Okay to proceed with concrete pour. | |
03/13/2024 | COT - RSEL - Electrical Underground | Passed | Electrical underground for kitchen island is in place. Okay to proceed with concrete pour. | |
03/13/2024 | COT - RSEL - Grounding/Bonding | Passed | Post-tension cabling is properly installed and spaced per plans, additional rebar reinforcement is in place as required, Ufer ground is in footing for exterior garage wall, and forms are set for a monolithic concrete pour. Okay to proceed with concrete pour. | |
04/02/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | 4/2/24: Missing anchor bolts Okay to do intermediates will check for corrections then. | |
04/02/2024 | COT - RSBU - Roof Nailing | Passed | ||
05/08/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 5/8/24: GEC is now properly connected to Ufer ground, backing plate added to sole plate at bathroom lavatory, all ductwork is properly connected to registers, and bath tub is filled to the top of tub with water. Mechanical, electrical, and plumbing rough-in is completed. Okay to proceed with installation of insulation and drywall. | |
05/08/2024 | COT - RSPL - Gas Pressure Test | Passed | Gas line is under 15# of compressed air with no leaks. Okay to proceed. | |
05/28/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
07/15/2024 | COT - BULD - SWG Clearance | Passed | SWG for. meter only | |
07/24/2024 | COT - RSPL - Sewer | Passed | 7/24/24: Underground plumbing is properly connected to sewer line and is under a water test with no leaks. Okay to shade pipe and backfill trench. | |
07/24/2024 | BULD - Electrical Clearance | Passed | Okay to energize panel. ECO Clearance issued to TEP for 9105 E. Red Bluff Ct. | |
08/09/2024 | COT - RSPL - Yard Water Line | Passed | ||
08/26/2024 | COT - RSEL - Electrical Final | Passed | Construction is complete. All utilities are connected and operational. Mechanical, electrical, and plumbing fixtures are properly installed and operational. Electrical panel is properly labeled with AFCI & GFCI Breakers installed as required. Outdoor lighting is properly installed per plan and city requirements. Okay to issue Certificate of Occupancy. | |
08/26/2024 | COT - RSEL - Outdoor Lighting | Passed | Outdoor lighting is is properly installed per plan and city regulations. | |
08/26/2024 | COT - RSME - Mechanical Final | Passed | Construction is complete. All utilities are connected and operational. Mechanical, electrical, and plumbing fixtures are properly installed and operational. Electrical panel is properly labeled with AFCI & GFCI Breakers installed as required. Outdoor lighting is properly installed per plan and city requirements. Okay to issue Certificate of Occupancy. | |
08/26/2024 | COT - RSPL - Plumbing Final | Passed | Construction is complete. All utilities are connected and operational. Mechanical, electrical, and plumbing fixtures are properly installed and operational. Electrical panel is properly labeled with AFCI & GFCI Breakers installed as required. Outdoor lighting is properly installed per plan and city requirements. Okay to issue Certificate of Occupancy. | |
08/26/2024 | RSBU - Building Final | Passed | Construction is complete. All utilities are connected and operational. Mechanical, electrical, and plumbing fixtures are properly installed and operational. Electrical panel is properly labeled with AFCI & GFCI Breakers installed as required. Outdoor lighting is properly installed per plan and city requirements. Okay to issue Certificate of Occupancy. | |
08/26/2024 | RSBU - Building Progress | Passed | Construction is complete. All utilities are connected and operational. Mechanical, electrical, and plumbing fixtures are properly installed and operational. Electrical panel is properly labeled with AFCI & GFCI Breakers installed as required. Outdoor lighting is properly installed per plan and city requirements. Okay to issue Certificate of Occupancy. | |
09/09/2024 | ENGR Engineering Final | Passed | Move in ready |