Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date |
Description |
Inspector |
Results |
Comments |
| 05/02/2024 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Re-inspection required |
GEC not properly connected to ufer, leak by bathroom, add boca plate to sole plate at bathroom lav, duct not connected to register, completely fill tub, stopped inspection. More items may be added. |
| 05/08/2024 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Passed |
5/8/24: GEC is now properly connected to Ufer ground, backing plate added to sole plate at bathroom lavatory, all ductwork is properly connected to registers, and bath tub is filled to the top of tub with water. Mechanical, electrical, and plumbing rough-in is completed. Okay to proceed with installation of insulation and drywall. |