Permit: TC-MDP-0124-00090
Permit Details
Apply Date:
01/16/2024
Applicant:
Kelly Rayman
Description:
Blackhawk H30A Model Plan
Permit Reviews
Permit Number - TC-MDP-0124-00090
Permit Status: Inspections complete
Permit Description: Blackhawk H30A Model Plan
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
02/26/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 03/01/2024 | APPROVED |
05/17/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 05/17/2024 | APPROVED |
01/17/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 01/23/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0124-00090
Permit Status: Inspections complete
Permit Description: Blackhawk H30A Model Plan
Total Outstanding Activity Conditions - 2
Date | Name |
---|---|
01/16/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
01/23/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
Conditions
Permit Number - TC-MDP-0124-00090
Permit Status: Inspections complete
Permit Description: Blackhawk H30A Model Plan
Date | Description | Comments |
---|---|---|
01/23/2024 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
01/17/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
01/17/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
03/01/2024 | Post-Tension Inspection Report is required. | |
09/05/2023 | Post-Tension Inspection Report is required. | |
01/23/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
08/18/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
03/01/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
09/05/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0124-00090
Permite Description: Blackhawk H30A Model Plan
Total Outstanding Inspections - 5
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/21/2024 | COT - RSEL - Electrical Final | N/A | Re-inspection required | 6/21/24: T&P drain must terminate 6" above grade, Receptacle at main panel require bubble cover, cut clean outs to grade, UV coat all plastic piping on exterior of home, properly secure HVAC disconnect box, stucco must be repaired throughout, inter system bonding termination must be properly secured, post tension tag required at hose bib, plumbing not complete at kitchen island. STOPPED INSPECTION MORE ITEMS MAY BE ADDED. |
06/21/2024 | COT - RSME - Mechanical Final | N/A | Re-inspection required | 6/21/24: T&P drain must terminate 6" above grade, Receptacle at main panel require bubble cover, cut clean outs to grade, UV coat all plastic piping on exterior of home, properly secure HVAC disconnect box, stucco must be repaired throughout, inter system bonding termination must be properly secured, post tension tag required at hose bib, plumbing not complete at kitchen island. STOPPED INSPECTION MORE ITEMS MAY BE ADDED. |
06/21/2024 | COT - RSPL - Plumbing Final | N/A | Re-inspection required | 6/21/24: T&P drain must terminate 6" above grade, Receptacle at main panel require bubble cover, cut clean outs to grade, UV coat all plastic piping on exterior of home, properly secure HVAC disconnect box, stucco must be repaired throughout, inter system bonding termination must be properly secured, post tension tag required at hose bib, plumbing not complete at kitchen island. STOPPED INSPECTION MORE ITEMS MAY BE ADDED. |
06/21/2024 | RSBU - Building Final | N/A | Re-inspection required | 6/21/24: T&P drain must terminate 6" above grade, Receptacle at main panel require bubble cover, cut clean outs to grade, UV coat all plastic piping on exterior of home, properly secure HVAC disconnect box, stucco must be repaired throughout, inter system bonding termination must be properly secured, post tension tag required at hose bib, plumbing not complete at kitchen island. STOPPED INSPECTION MORE ITEMS MAY BE ADDED. |
06/21/2024 | RSBU - Building Progress | N/A | Re-inspection required | 6/21/24: T&P drain must terminate 6" above grade, Receptacle at main panel require bubble cover, cut clean outs to grade, UV coat all plastic piping on exterior of home, properly secure HVAC disconnect box, stucco must be repaired throughout, inter system bonding termination must be properly secured, post tension tag required at hose bib, plumbing not complete at kitchen island. STOPPED INSPECTION MORE ITEMS MAY BE ADDED. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0124-00090
Permit Description: Blackhawk H30A Model Plan
Total Completed Inspections - 22