Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Address NEW:
6196 E CAMPOLINA TR
Apply Date:
01/16/2024
Applicant:
Helen Ormsby
Description:
Blackhawk H30D Model Plan

Permit Reviews

Permit Number - TC-MDP-0124-00080
Permit Status: Inspections complete
Permit Description: Blackhawk H30D Model Plan
Start Date Submittal Complete Date Status  
08/28/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 08/28/2025 APPROVED Review Details
01/17/2024 SITE FROM MODEL PERMIT - SUBDIVISION v.1 01/23/2024 APPROVED Review Details
10/22/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 10/23/2025 APPROVED Review Details
02/26/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 02/29/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0124-00080
Permit Status: Inspections complete
Permit Description: Blackhawk H30D Model Plan
Date Description Comments
01/17/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
01/17/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
10/03/2023 Post-Tension Inspection Report is required.
08/23/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
10/04/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
02/29/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
10/04/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
02/29/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
09/07/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0124-00080
Permite Description: Blackhawk H30D Model Plan
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
09/16/2025 COT - RSBU - Preslab N/A Re-inspection required 9.16.2025
Trench per detail SD1-1 does not have proper depth or width to natural grade throughout, beam footing trench per plan states 10" x 24" width depth.
11/10/2025 COT - BULD - SWG Clearance N/A Re-inspection required 11-10-25: missing shut off valve.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0124-00080
Permit Description: Blackhawk H30D Model Plan
Total Completed Inspections - 21
Date Description Inspector Results Comments
09/09/2025 COT - RSPL - Rough Soil Passed 9.9.25
Approved
Proceed
09/09/2025 COT - RSPL - Sewer Passed 9.9.25
Approved
Proceed
09/09/2025 COT - RSPL - Yard Water Line Passed 9.9.25
Tracer verified
Pressure verified APPROVED
09/16/2025 BULD - Electrical Clearance Passed 9.16.2025
Clearance for TEP ECO.
09/16/2025 COT - RSBU - Excavation/Rebar/Zoning Passed
09/16/2025 COT - RSEL - Electrical Underground Passed
09/16/2025 COT - RSEL - Grounding/Bonding Passed
09/17/2025 COT - RSBU - Preslab Passed 9.17.2025
Correction made to yesterday's inspection . Okay for concrete placement.
09/24/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
09/24/2025 COT - RSBU - Roof Nailing Passed
10/03/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
10/03/2025 COT - RSPL - Gas Pressure Test Passed
10/13/2025 COT - RSBU - Interior Shear Bracing Passed
11/10/2025 COT - BULD - SWG Clearance Passed 11-10-25: okay to install meter. Clearance issued to SWG.
11/14/2025 COT - RSEL - Outdoor Lighting Passed
11/14/2025 COT - RSME - Mechanical Final Passed
11/14/2025 COT - RSPL - Plumbing Final Passed
11/14/2025 ENGR Engineering Final Passed Site is complete in accordance with approved plans.
11/14/2025 RSBU - Building Progress Passed
11/18/2025 COT - RSEL - Electrical Final Passed 11.18.2025
Corrections made to prior inspection.
11/18/2025 RSBU - Building Final Passed 11.18.2025
Corrections made to prior inspection.

Documents

File Name Document Type  
BHK 98 SIC-2025-10-22_V1.PDF DOCUMENTS VIEW
BHK 98 REV1 NARRATIVE_V1 (4)_V1.PDF DOCUMENTS VIEW
BHK 98 REV1 SIC-2024-02-19_V1 (4)-2024-02-29_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BHK 98 D1_V1.PDF DOCUMENTS VIEW
BHK 98 SIC-2024-01-16_V1.PDF DOCUMENTS VIEW