Permit: TC-MDP-0124-00080
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
6196 E CAMPOLINA TR
Address NEW:
6196 E CAMPOLINA TR
Apply Date:
01/16/2024
Applicant:
Helen Ormsby
Description:
Blackhawk H30D Model Plan
Permit Reviews
Permit Number - TC-MDP-0124-00080
Permit Status: Inspections complete
Permit Description: Blackhawk H30D Model Plan
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/28/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/28/2025 | APPROVED |
| 01/17/2024 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 01/23/2024 | APPROVED |
| 10/22/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/23/2025 | APPROVED |
| 02/26/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 02/29/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0124-00080
Permit Status: Inspections complete
Permit Description: Blackhawk H30D Model Plan
| Date | Description | Comments |
|---|---|---|
| 01/17/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 01/17/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 10/03/2023 | Post-Tension Inspection Report is required. | |
| 08/23/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 10/04/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 02/29/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
| 10/04/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
| 02/29/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
| 09/07/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0124-00080
Permite Description: Blackhawk H30D Model Plan
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/16/2025 | COT - RSBU - Preslab | N/A | Re-inspection required | 9.16.2025 Trench per detail SD1-1 does not have proper depth or width to natural grade throughout, beam footing trench per plan states 10" x 24" width depth. |
| 11/10/2025 | COT - BULD - SWG Clearance | N/A | Re-inspection required | 11-10-25: missing shut off valve. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0124-00080
Permit Description: Blackhawk H30D Model Plan
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/09/2025 | COT - RSPL - Rough Soil | Passed | 9.9.25 Approved Proceed |
|
| 09/09/2025 | COT - RSPL - Sewer | Passed | 9.9.25 Approved Proceed |
|
| 09/09/2025 | COT - RSPL - Yard Water Line | Passed | 9.9.25 Tracer verified Pressure verified APPROVED |
|
| 09/16/2025 | BULD - Electrical Clearance | Passed | 9.16.2025 Clearance for TEP ECO. |
|
| 09/16/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 09/16/2025 | COT - RSEL - Electrical Underground | Passed | ||
| 09/16/2025 | COT - RSEL - Grounding/Bonding | Passed | ||
| 09/17/2025 | COT - RSBU - Preslab | Passed | 9.17.2025 Correction made to yesterday's inspection . Okay for concrete placement. |
|
| 09/24/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 09/24/2025 | COT - RSBU - Roof Nailing | Passed | ||
| 10/03/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 10/03/2025 | COT - RSPL - Gas Pressure Test | Passed | ||
| 10/13/2025 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 11/10/2025 | COT - BULD - SWG Clearance | Passed | 11-10-25: okay to install meter. Clearance issued to SWG. | |
| 11/14/2025 | COT - RSEL - Outdoor Lighting | Passed | ||
| 11/14/2025 | COT - RSME - Mechanical Final | Passed | ||
| 11/14/2025 | COT - RSPL - Plumbing Final | Passed | ||
| 11/14/2025 | ENGR Engineering Final | Passed | Site is complete in accordance with approved plans. | |
| 11/14/2025 | RSBU - Building Progress | Passed | ||
| 11/18/2025 | COT - RSEL - Electrical Final | Passed | 11.18.2025 Corrections made to prior inspection. |
|
| 11/18/2025 | RSBU - Building Final | Passed | 11.18.2025 Corrections made to prior inspection. |