Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSEL - Electrical Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/14/2025 | COT - RSEL - Electrical Final | Re-inspection required | 11.14.2025 Hot & ground reversed in master bathroom. |
|
| 11/18/2025 | COT - RSEL - Electrical Final | Passed | 11.18.2025 Corrections made to prior inspection. |