Permit Details

Status:
Complete
Type:
Model Building Permit
Address:
2381 S CLOVIS PL
Address NEW:
2381 S CLOVIS PL
Apply Date:
01/25/2024
Applicant:
Description:
SFR PANT2022 T22-M0073 Pantano Vista Lots 1-32

Permit Reviews

Permit Number - TC-MDP-0124-00065
Permit Status: Complete
Permit Description: SFR PANT2022 T22-M0073 Pantano Vista Lots 1-32
Start Date Submittal Complete Date Status  
01/26/2024 SITE FROM MODEL PERMIT - SUBDIVISION v.1 01/30/2024 REQUIRES RESUBMIT Review Details
04/25/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 04/28/2025 APPROVED Review Details
01/31/2024 SITE FROM MODEL PERMIT - SUBDIVISION v.2 02/01/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0124-00065
Permit Status: Complete
Permit Description: SFR PANT2022 T22-M0073 Pantano Vista Lots 1-32
Date Description Comments
12/12/2022 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
01/10/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
06/15/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
01/10/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
06/15/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
01/26/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0124-00065
Permite Description: SFR PANT2022 T22-M0073 Pantano Vista Lots 1-32
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
04/17/2025 COT - BULD - SWG Clearance N/A Not Applicable Site does not use gas
04/17/2025 COT - RSPL - Gas Pressure Test N/A Not Applicable Site does not use gas

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0124-00065
Permit Description: SFR PANT2022 T22-M0073 Pantano Vista Lots 1-32
Total Completed Inspections - 20
Date Description Inspector Results Comments
03/14/2024 COT - RSPL - Backwater Valve Passed
03/14/2024 COT - RSPL - Rough Soil Passed
03/14/2024 COT - RSPL - Sewer Passed
03/14/2024 COT - RSPL - Yard Water Line Passed
03/22/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
03/22/2024 COT - RSBU - Preslab Passed
03/22/2024 COT - RSEL - Grounding/Bonding Passed
05/01/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed All exterior walls are sheathed with plywood and are nailed per plans. Interior shear walls are properly installed and are nailed per plans. Bottom plates are held down by bolts, shot pins, or cut nails. All shear clips and masa clips are properly nailed to walls and bottom plates. Okay to proceed with dry-in for stucco applications.
05/01/2024 COT - RSBU - Roof Nailing Passed Trusses are nailed to top plate and have H2.5 clips attached. Plywood sheathing is properly nailed to trusses per plan and code. Okay to proceed with top out of plumbing.
05/15/2024 COT - RSEL - Electrical Underground Passed
05/17/2024 BULD - Electrical Clearance Passed ECO Clearance issued.
07/02/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
07/15/2024 COT - RSBU - Interior Shear Bracing Passed
12/16/2024 RSBU - Building Progress Passed
04/17/2025 COT - RSEL - Electrical Final Passed Passed final 4/17/25
04/17/2025 COT - RSEL - Outdoor Lighting Passed Passed final 4/17/25
04/17/2025 COT - RSME - Mechanical Final Passed Passed final 4/17/25
04/17/2025 COT - RSPL - Plumbing Final Passed Passed final 4/17/25
04/17/2025 ENGR Engineering Final Passed Site is good. C of O ready.
04/17/2025 RSBU - Building Final Passed Passed final 4/17/25

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
SI CERT LOT 31.1-2025-04-24_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
SITE PLAN LOT 31_V1_V2.PDF DOCUMENTS VIEW