Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
01/09/2024
Applicant:
Daria Hopkins
Description:
SFR MERI156021 T21-M0063

Permit Reviews

Permit Number - TC-MDP-0124-00047
Permit Status: Complete
Permit Description: SFR MERI156021 T21-M0063
Start Date Submittal Complete Date Status  
03/05/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 03/15/2024 APPROVED Review Details
10/14/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 10/15/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0124-00047
Permit Status: Complete
Permit Description: SFR MERI156021 T21-M0063
Date Description Comments
03/15/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
03/15/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
03/15/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
03/15/2024 Post-Installed Anchor Inspection Report is required.
03/15/2024 Post-Tension Inspection Report is required.
01/09/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
01/09/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
03/15/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
03/15/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0124-00047
Permite Description: SFR MERI156021 T21-M0063
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
10/01/2024 COT - RSBU - Interior Shear Bracing N/A Re-inspection required Re inspection required. 10/1/2024

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0124-00047
Permit Description: SFR MERI156021 T21-M0063
Total Completed Inspections - 22
Date Description Inspector Results Comments
07/23/2024 COT - RSPL - Yard Water Line Passed
07/24/2024 COT - RSPL - Backwater Valve Passed Okay to backfill. Shading is required. 7/24/2024
07/24/2024 COT - RSPL - Rough Soil Passed Okay to backfill. Shading is required. 7/24/2024
07/24/2024 COT - RSPL - Sewer Passed Okay to backfill. Shading is required. 7/24/2024
07/31/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
07/31/2024 COT - RSBU - Preslab Passed
07/31/2024 COT - RSEL - Electrical Underground Passed
07/31/2024 COT - RSEL - Grounding/Bonding Passed
08/16/2024 COT - RSBU - Exterior Clips/Sheathing Passed
08/16/2024 COT - RSBU - Roof Nailing Passed
09/13/2024 BULD - Electrical Clearance Passed Clearance for TEP ECO. 9/13/2024
09/13/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
09/13/2024 COT - RSPL - Gas Pressure Test Passed
10/03/2024 COT - RSBU - Interior Shear Bracing Passed
11/07/2024 COT - BULD - SWG Clearance Passed 11-7-24, approved for Southwest Gas connection.
11/21/2024 COT - RSEL - Electrical Final Passed 11-21-24, building final, electrical, mechanical, plumbing, outdoor lighting are all approved.
11/21/2024 COT - RSEL - Outdoor Lighting Passed 11-21-24, building final, electrical, mechanical, plumbing, outdoor lighting are all approved.
11/21/2024 COT - RSME - Mechanical Final Passed 11-21-24, building final, electrical, mechanical, plumbing, outdoor lighting are all approved.
11/21/2024 COT - RSPL - Plumbing Final Passed 11-21-24, building final, electrical, mechanical, plumbing, outdoor lighting are all approved.
11/21/2024 RSBU - Building Final Passed 11-21-24, building final, electrical, mechanical, plumbing, outdoor lighting are all approved.
11/21/2024 RSBU - Building Progress Passed 11-21-24, building final, electrical, mechanical, plumbing, outdoor lighting are all approved.
12/11/2024 ENGR Engineering Final Passed CO Ready

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
LOT 139 FINAL SIC-2024-10-12_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 139 APPLICATION_V1.PDF DOCUMENTS VIEW
LOT 139 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 139 SPECIAL INSPECTION CERTIFICATE-2024-03-05_V1.PDF DOCUMENTS VIEW