Permit: TC-MDP-0124-00045
Permit Details
Apply Date:
01/09/2024
Applicant:
Daria Hopkins
Description:
SFR MER1402190 T21-M0078
Permit Reviews
Permit Number - TC-MDP-0124-00045
Permit Status: Issued
Permit Description: SFR MER1402190 T21-M0078
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
02/01/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 02/06/2024 | APPROVED |
08/23/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/23/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0124-00045
Permit Status: Issued
Permit Description: SFR MER1402190 T21-M0078
Date | Description | Comments |
---|---|---|
02/01/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
02/01/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
02/01/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
02/02/2024 | Post-Tension Inspection Report is required. | |
01/09/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
01/09/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
02/02/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Issued
Permit Number: TC-MDP-0124-00045
Permit Description: SFR MER1402190 T21-M0078
Total Completed Inspections - 14
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/28/2024 | COT - RSPL - Rough Soil | Passed | Underground plumbing is connected to the main sewer line and entire system is under a water test with no leaks. Okay to shade pipes and backfill trenches. | |
06/28/2024 | COT - RSPL - Sewer | Passed | Underground plumbing is connected to the main sewer line and entire system is under a water test with no leaks. Okay to shade pipes and backfill trenches. | |
06/28/2024 | COT - RSPL - Yard Water Line | Passed | Main water line is connected to the meter and under street pressure with no leaks. Okay to shade pipe and backfill trench. | |
07/10/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Concrete forms are set, post tension cabling is evenly spaced and secured to forms, underground electrical conduit is installed for kitchen island, underground plumbing pipes are properly wrapped with foam, shear wall hold downs are attached to form per plan location, masa clips are evenly spaced on forms, rebar reinforcement is installed per plans, and Ufer ground is installed in bottom of garage footing. Okay to pour concrete for footings and slab. | |
07/10/2024 | COT - RSBU - Preslab | Passed | Concrete forms are set, post tension cabling is evenly spaced and secured to forms, underground electrical conduit is installed for kitchen island, underground plumbing pipes are properly wrapped with foam, shear wall hold downs are attached to form per plan location, masa clips are evenly spaced on forms, rebar reinforcement is installed per plans, and Ufer ground is installed in bottom of garage footing. Okay to pour concrete for footings and slab. | |
07/10/2024 | COT - RSEL - Electrical Underground | Passed | Concrete forms are set, post tension cabling is evenly spaced and secured to forms, underground electrical conduit is installed for kitchen island, underground plumbing pipes are properly wrapped with foam, shear wall hold downs are attached to form per plan location, masa clips are evenly spaced on forms, rebar reinforcement is installed per plans, and Ufer ground is installed in bottom of garage footing. Okay to pour concrete for footings and slab. | |
07/10/2024 | COT - RSEL - Grounding/Bonding | Passed | Concrete forms are set, post tension cabling is evenly spaced and secured to forms, underground electrical conduit is installed for kitchen island, underground plumbing pipes are properly wrapped with foam, shear wall hold downs are attached to form per plan location, masa clips are evenly spaced on forms, rebar reinforcement is installed per plans, and Ufer ground is installed in bottom of garage footing. Okay to pour concrete for footings and slab. | |
07/26/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
07/26/2024 | COT - RSBU - Roof Nailing | Passed | ||
08/26/2024 | BULD - Electrical Clearance | Passed | ||
08/26/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
08/26/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
09/05/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
10/30/2024 | COT - BULD - SWG Clearance | Passed | Gas valves are installed on gas pipes at each gas appliance location. Okay to install meter and turn on gas. |