Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Model Building Permit
Apply Date:
01/09/2024
Applicant:
Daria Hopkins
Description:
SFR MER1402190 T21-M0078

Permit Reviews

Permit Number - TC-MDP-0124-00045
Permit Status: Issued
Permit Description: SFR MER1402190 T21-M0078
Start Date Submittal Complete Date Status  
02/01/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 02/06/2024 APPROVED Review Details
08/23/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 08/23/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0124-00045
Permit Status: Issued
Permit Description: SFR MER1402190 T21-M0078
Date Description Comments
02/01/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
02/01/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
02/01/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
02/02/2024 Post-Tension Inspection Report is required.
01/09/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
01/09/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
02/02/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Issued
Permit Number: TC-MDP-0124-00045
Permit Description: SFR MER1402190 T21-M0078
Total Completed Inspections - 14
Date Description Inspector Results Comments
06/28/2024 COT - RSPL - Rough Soil Passed Underground plumbing is connected to the main sewer line and entire system is under a water test with no leaks. Okay to shade pipes and backfill trenches.
06/28/2024 COT - RSPL - Sewer Passed Underground plumbing is connected to the main sewer line and entire system is under a water test with no leaks. Okay to shade pipes and backfill trenches.
06/28/2024 COT - RSPL - Yard Water Line Passed Main water line is connected to the meter and under street pressure with no leaks. Okay to shade pipe and backfill trench.
07/10/2024 COT - RSBU - Excavation/Rebar/Zoning Passed Concrete forms are set, post tension cabling is evenly spaced and secured to forms, underground electrical conduit is installed for kitchen island, underground plumbing pipes are properly wrapped with foam, shear wall hold downs are attached to form per plan location, masa clips are evenly spaced on forms, rebar reinforcement is installed per plans, and Ufer ground is installed in bottom of garage footing. Okay to pour concrete for footings and slab.
07/10/2024 COT - RSBU - Preslab Passed Concrete forms are set, post tension cabling is evenly spaced and secured to forms, underground electrical conduit is installed for kitchen island, underground plumbing pipes are properly wrapped with foam, shear wall hold downs are attached to form per plan location, masa clips are evenly spaced on forms, rebar reinforcement is installed per plans, and Ufer ground is installed in bottom of garage footing. Okay to pour concrete for footings and slab.
07/10/2024 COT - RSEL - Electrical Underground Passed Concrete forms are set, post tension cabling is evenly spaced and secured to forms, underground electrical conduit is installed for kitchen island, underground plumbing pipes are properly wrapped with foam, shear wall hold downs are attached to form per plan location, masa clips are evenly spaced on forms, rebar reinforcement is installed per plans, and Ufer ground is installed in bottom of garage footing. Okay to pour concrete for footings and slab.
07/10/2024 COT - RSEL - Grounding/Bonding Passed Concrete forms are set, post tension cabling is evenly spaced and secured to forms, underground electrical conduit is installed for kitchen island, underground plumbing pipes are properly wrapped with foam, shear wall hold downs are attached to form per plan location, masa clips are evenly spaced on forms, rebar reinforcement is installed per plans, and Ufer ground is installed in bottom of garage footing. Okay to pour concrete for footings and slab.
07/26/2024 COT - RSBU - Exterior Clips/Sheathing Passed
07/26/2024 COT - RSBU - Roof Nailing Passed
08/26/2024 BULD - Electrical Clearance Passed
08/26/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
08/26/2024 COT - RSPL - Gas Pressure Test Passed
09/05/2024 COT - RSBU - Interior Shear Bracing Passed
10/30/2024 COT - BULD - SWG Clearance Passed Gas valves are installed on gas pipes at each gas appliance location. Okay to install meter and turn on gas.

Documents

File Name Document Type  
148755 PT LOT 59 COMPLETE-2024-08-22_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 59 APPLICATION_V1.PDF DOCUMENTS VIEW
LOT 59 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 59 SPECIAL INSPECTION CERTIFICATE-2024-02-01_V1.PDF DOCUMENTS VIEW