Permit: TC-MDP-0124-00031
Permit Details
Apply Date:
01/08/2024
Applicant:
Dana Petty
Description:
SFR 230.2380 T21-M0028
Permit Reviews
Permit Number - TC-MDP-0124-00031
Permit Status: Issued
Permit Description: SFR 230.2380 T21-M0028
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/09/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 01/18/2024 | APPROVED |
08/12/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/13/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0124-00031
Permit Status: Issued
Permit Description: SFR 230.2380 T21-M0028
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
01/08/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
Conditions
Permit Number - TC-MDP-0124-00031
Permit Status: Issued
Permit Description: SFR 230.2380 T21-M0028
Date | Description | Comments |
---|---|---|
01/09/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
01/09/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
01/11/2024 | Post-Tension Inspection Report is required. | |
01/08/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
01/11/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-MDP-0124-00031
Permite Description: SFR 230.2380 T21-M0028
Total Outstanding Inspections - 8
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/22/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Partial Pass | DWV was put on test. Need 15 minutes minimum to check if holding pressure. 7/22/2024 |
07/22/2024 | COT - RSPL - Gas Pressure Test | N/A | Partial Pass | Partial pass pending 15 minutes on test. 7/22/2024 |
09/30/2024 | COT - RSEL - Electrical Final | N/A | Not Ready | |
09/30/2024 | COT - RSEL - Outdoor Lighting | N/A | Not Ready | |
09/30/2024 | COT - RSME - Mechanical Final | N/A | Not Ready | |
09/30/2024 | COT - RSPL - Plumbing Final | N/A | Not Ready | |
09/30/2024 | ENGR Engineering Final | N/A | Re-inspection required | Please walk your homes prior to scheduling. 1) Grade not completed. 2) No landscaping 3) No gate. 4) Roof material stacked on roof a hazard. |
09/30/2024 | RSBU - Building Final | N/A | Not Ready |
Completed Inspections
Permit Status: Issued
Permit Number: TC-MDP-0124-00031
Permit Description: SFR 230.2380 T21-M0028
Total Completed Inspections - 15