Permit: TC-MDP-0124-00027
Permit Details
Apply Date:
01/08/2024
Applicant:
Daria Hopkins
Description:
SFR 230.2380 T21-M0028
Permit Reviews
Permit Number - TC-MDP-0124-00027
Permit Status: Complete
Permit Description: SFR 230.2380 T21-M0028
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
10/28/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/29/2024 | APPROVED |
01/08/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 01/18/2024 | APPROVED |
07/29/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/30/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0124-00027
Permit Status: Complete
Permit Description: SFR 230.2380 T21-M0028
Date | Description | Comments |
---|---|---|
01/08/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
01/08/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
01/09/2024 | Post-Tension Inspection Report is required. | |
01/08/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
01/08/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
01/09/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0124-00027
Permite Description: SFR 230.2380 T21-M0028
Total Outstanding Inspections - 2
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/17/2024 | COT - RSEL - Outdoor Lighting | N/A | Not Ready | Not ready, roofers still installing tiles |
10/17/2024 | RSBU - Building Progress | N/A | Not Ready |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0124-00027
Permit Description: SFR 230.2380 T21-M0028
Total Completed Inspections - 21
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/12/2024 | COT - RSPL - Yard Water Line | Passed | ||
06/12/2024 | COT - RSPL - Rough Soil | Passed | ||
06/12/2024 | COT - RSPL - Sewer | Passed | ||
06/21/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
06/21/2024 | COT - RSBU - Preslab | Passed | 6/21/24: reinforcement and grounding per plan. Ok for concrete placement | |
06/21/2024 | COT - RSEL - Electrical Underground | Passed | 6/21/24: reinforcement and grounding per plan. Ok for concrete placement | |
06/21/2024 | COT - RSEL - Grounding/Bonding | Passed | 6/21/24: reinforcement and grounding per plan. Ok for concrete placement | |
07/08/2024 | COT - RSBU - Roof Nailing | Passed | ||
07/08/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
07/31/2024 | BULD - Electrical Clearance | Passed | TEP ECO | |
08/06/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
08/08/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Corrections were made. 8/8/2024 | |
08/27/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
10/03/2024 | COT - BULD - SWG Clearance | Passed | 10/3/24: SWG Clearance ok for meter tag | |
10/18/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
10/18/2024 | RSBU - Building Progress | Passed | ||
10/25/2024 | COT - RSEL - Electrical Final | Passed | Not ready, roofers still installing tiles 10/18/24: Properly wrap insulation at main hose bib, properly secure A/C condenser whip, single wall pipe at water heater vent must be taped, thermostat shall be no high than 54" above finish 10-24-24, see previous notes. Thermostat shall be no higher than 54 inches. 10/25/24: corrections made ok for CofO |
|
10/25/2024 | COT - RSME - Mechanical Final | Passed | Not ready, roofers still installing tiles 10/18/24: Properly wrap insulation at main hose bib, properly secure A/C condenser whip, single wall pipe at water heater vent must be taped, thermostat shall be no high than 54" above finish 10-24-24, see previous notes. Thermostat shall be no higher than 54 inches. 10/25/24: corrections made ok for CofO |
|
10/25/2024 | COT - RSPL - Plumbing Final | Passed | Not ready, roofers still installing tiles 10/18/24: Properly wrap insulation at main hose bib, properly secure A/C condenser whip, single wall pipe at water heater vent must be taped, thermostat shall be no high than 54" above finish 10-24-24, see previous notes. Thermostat shall be no higher than 54 inches. 10/25/24: corrections made ok for CofO |
|
10/25/2024 | ENGR Engineering Final | Passed | clean up debris around site. | |
10/25/2024 | RSBU - Building Final | Passed | Not ready, roofers still installing tiles 10/18/24: Properly wrap insulation at main hose bib, properly secure A/C condenser whip, single wall pipe at water heater vent must be taped, thermostat shall be no high than 54" above finish 10-24-24, see previous notes. Thermostat shall be no higher than 54 inches. 10/25/24: corrections made ok for CofO |