Inspection Status: Not Ready

Inspection History: RSBU - Building Final 

Permit Number - TC-MDP-0124-00027

Inspection Description - RSBU - Building Final 

Inspection Status - Not Ready

Date Description Inspector Results Comments
10/17/2024 RSBU - Building Final  Not Ready Not ready, roofers still installing tiles
10/18/2024 RSBU - Building Final  Re-inspection required Not ready, roofers still installing tiles
10/18/24: Properly wrap insulation at main hose bib, properly secure A/C condenser whip, single wall pipe at water heater vent must be taped, thermostat shall be no high than 54" above finish floor
10/24/2024 RSBU - Building Final  Re-inspection required 10-24-24, see previous notes. Lower height of Thermostat. It shall be no higher than 54 inches above finished floor.A/C condenser whip has been properly secured and hose bib now contains insulation.
10/25/2024 RSBU - Building Final  Passed Not ready, roofers still installing tiles
10/18/24: Properly wrap insulation at main hose bib, properly secure A/C condenser whip, single wall pipe at water heater vent must be taped, thermostat shall be no high than 54" above finish
10-24-24, see previous notes. Thermostat shall be no higher than 54 inches.
10/25/24: corrections made ok for CofO