Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Model Building Permit
Apply Date:
01/03/2024
Applicant:
Craig Morczynski
Description:
SFR LENNLE4005 T22-M0049

Permit Reviews

Permit Number - TC-MDP-0124-00006
Permit Status: Issued
Permit Description: SFR LENNLE4005 T22-M0049
Start Date Submittal Complete Date Status  
01/04/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 01/09/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0124-00006
Permit Status: Issued
Permit Description: SFR LENNLE4005 T22-M0049
Total Outstanding Activity Conditions - 6
Date Name
01/04/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
01/04/2024 Post-Installed Anchor Inspection Report is required.
01/04/2024 Post-Tension Inspection Report is required.
01/04/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
01/04/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.
07/18/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.

Conditions

Permit Number - TC-MDP-0124-00006
Permit Status: Issued
Permit Description: SFR LENNLE4005 T22-M0049
Date Description Comments
07/18/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Completed Inspections

Permit Status: Issued
Permit Number: TC-MDP-0124-00006
Permit Description: SFR LENNLE4005 T22-M0049
Total Completed Inspections - 21
Date Description Inspector Results Comments
02/29/2024 COT - RSPL - Rough Soil Passed
02/29/2024 COT - RSPL - Sewer Passed
02/29/2024 COT - RSPL - Yard Water Line Passed
03/14/2024 COT - RSBU - Preslab Passed
03/14/2024 COT - RSEL - Electrical Underground Passed
03/14/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
03/14/2024 COT - RSEL - Grounding/Bonding Passed
04/16/2024 COT - RSBU - Roof Nailing Passed
05/06/2024 COT - RSBU - Exterior Clips/Sheathing Passed
05/23/2024 COT - RSPL - Gas Pressure Test Passed
05/23/2024 RSBU - Building Progress Passed
05/24/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
05/30/2024 BULD - Electrical Clearance Passed
06/06/2024 COT - RSBU - Interior Shear Bracing Passed
08/23/2024 COT - BULD - SWG Clearance Passed 8/23/24: duplicate inspection. Salvador passed SWG clearance Aug 15.
08/27/2024 COT - RSEL - Outdoor Lighting Passed
08/27/2024 COT - RSPL - Plumbing Final Passed
10/08/2024 COT - RSEL - Electrical Final Passed PASS 10/8/24
10/08/2024 COT - RSME - Mechanical Final Passed PASS 10/8/24
10/08/2024 RSBU - Building Final Passed PASS 10/8/24
10/08/2024 ENGR Engineering Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LA ESTANCIA II HOMESITE 88 OK TO PERMIT_V1.PDF DOCUMENTS VIEW
LA ESTANCIA II HOMESITE 88 SIC-2024-01-03_V1.PDF DOCUMENTS VIEW