Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
12/19/2022
Applicant:
Celina Rodriguez
Description:
SFR BT1465-130 T22-M0011

Permit Reviews

Permit Number - TC-MDP-0123-00351
Permit Status: Complete
Permit Description: SFR BT1465-130 T22-M0011
Start Date Submittal Complete Date Status  
01/27/2023 RESIDENTIAL NEW DWELLING v.1 02/03/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0123-00351
Permit Status: Complete
Permit Description: SFR BT1465-130 T22-M0011
Total Outstanding Activity Conditions - 7
Date Name
02/01/2023 Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents.
02/01/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
02/01/2023 Post-Installed Anchor Inspection Report is required.
02/01/2023 Post-Tension Inspection Report is required.
02/01/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.
06/15/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
06/15/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0123-00351
Permite Description: SFR BT1465-130 T22-M0011
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
03/28/2023 COT - RSBU - Interior Shear Bracing N/A Not Ready

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0123-00351
Permit Description: SFR BT1465-130 T22-M0011
Total Completed Inspections - 21
Date Description Inspector Results Comments
02/17/2023 COT - RSPL - Rough Soil Passed
02/17/2023 COT - RSPL - Yard Water Line Passed
02/17/2023 COT - RSPL - Sewer Passed
02/27/2023 COT - RSBU - Preslab Passed Post tension cables in place. Compaction of soil is complete. Okay to pour slab.
02/27/2023 COT - RSEL - Electrical Underground Passed Electrical conduit for kitchen island is in place.
02/27/2023 COT - RSBU - Excavation/Rebar/Zoning Passed Post tension cables are in place. Tie downs are properly placed and secured to form work. Plumbers are wrapping pipes in pour.
03/13/2023 COT - RSBU - Exterior Clips/Sheathing Passed
03/13/2023 COT - RSBU - Roof Nailing Passed
03/28/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
03/28/2023 COT - RSEL - Grounding/Bonding Passed
03/28/2023 COT - RSPL - Gas Pressure Test Passed
04/04/2023 BULD - Electrical Clearance Passed
04/11/2023 COT - RSBU - Interior Shear Bracing Passed
07/06/2023 COT - BULD - SWG Clearance Passed
07/24/2023 RSBU - Building Final Passed
07/24/2023 RSBU - Building Progress Passed
07/24/2023 COT - RSEL - Electrical Final Passed
07/24/2023 COT - RSEL - Outdoor Lighting Passed
07/24/2023 COT - RSME - Mechanical Final Passed
07/24/2023 COT - RSPL - Gas Final Passed
07/24/2023 COT - RSPL - Plumbing Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BELLA TIERRA PHASE 2 - LOT 94 START_V1.PDF DOCUMENTS VIEW
BTII 94 SIC-2023-01-25_V1.PDF DOCUMENTS VIEW