Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Inspection Status: Re-inspection required

Inspection History: RSBU - Building Progress

Permit Number - TC-MDP-0123-00351

Inspection Description - RSBU - Building Progress

Inspection Status - Re-inspection required

Date Description Inspector Results Comments
07/18/2023 RSBU - Building Progress Re-inspection required 7/18/23: A/C unit is being over charged (25amp max), receptacle at island is not permitted due to overhang being greater than 6" (E3901.4.5 receptacle outlet location(exception))
07/21/2023 RSBU - Building Progress Passed 7/18/23: A/C unit is being over charged (25amp max), receptacle at island is not permitted due to overhang being greater than 6" (E3901.4.5 receptacle outlet location(exception))
07/24/2023 RSBU - Building Progress Passed