Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Re-inspection required
Inspection History: RSBU - Building Progress
Permit Number - TC-MDP-0123-00351
Inspection Description - RSBU - Building Progress
Inspection Status - Re-inspection required
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/18/2023 | RSBU - Building Progress | Re-inspection required | 7/18/23: A/C unit is being over charged (25amp max), receptacle at island is not permitted due to overhang being greater than 6" (E3901.4.5 receptacle outlet location(exception)) | |
07/21/2023 | RSBU - Building Progress | Passed | 7/18/23: A/C unit is being over charged (25amp max), receptacle at island is not permitted due to overhang being greater than 6" (E3901.4.5 receptacle outlet location(exception)) | |
07/24/2023 | RSBU - Building Progress | Passed |