Apply Date:
12/05/2022
Applicant:
CHARLES ELMER
Description:
SFR model Plan Alum 1585R
Permit Reviews
Permit Number - TC-MDP-0123-00330
Permit Status: Complete
Permit Description: SFR model Plan Alum 1585R
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
03/17/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 03/20/2023 | APPROVED |
01/18/2023 | RESIDENTIAL NEW DWELLING v.1 | 02/08/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0123-00330
Permit Status: Complete
Permit Description: SFR model Plan Alum 1585R
Total Outstanding Activity Conditions - 3
Date | Name |
---|---|
02/02/2023 | Applies to All: Deferred submittal documents must be submitted and approved prior to installation of construction elements included in deferred submittal documents. |
02/27/2023 | A final elevation certificate must be completed before final inspection |
02/27/2023 | An intermediate elevation certificate of the formed pre-slab must be completed before the pre-slab inspection |
Conditions
Permit Number - TC-MDP-0123-00330
Permit Status: Complete
Permit Description: SFR model Plan Alum 1585R
Date | Description | Comments |
---|---|---|
02/02/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0123-00330
Permite Description: SFR model Plan Alum 1585R
Total Outstanding Inspections - 20
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/03/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Re-inspection required | 5-3-23: 1-The grounding electrode conductor for 1619 is spliced inside the service for 1617; This is not allowed per IRC E3610.1. 2-Window in Bedroom Four in not per approved plans. 3-Staggered stud walls need vertical fire locking at 10' maximum spacing per IRC R302.11#1.2. |
07/26/2023 | COT - RSME - Hydronic Piping | N/A | Not Applicable | |
07/26/2023 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
05/03/2023 | COT - RSBU - Firewall/Fire Barrier/Firestop | N/A | Not Ready | No access for inspection. |
05/03/2023 | COT - RSBU - Interior Shear Bracing | N/A | Not Ready | No access for inspection. |
07/26/2023 | COT - RSBU - Masonry Pregrout | N/A | Not Applicable | |
07/26/2023 | COT - RSBU - Stem Wall/Retaining Wall | N/A | Not Applicable | |
07/26/2023 | COT - RSME - Mechanical Underground | N/A | Not Applicable | |
07/26/2023 | COT - RSMH - Mobile/Mod Home Electrical | N/A | Not Applicable | |
07/26/2023 | COT - RSMH - Mobile/Mod Home Final | N/A | Not Applicable | |
07/26/2023 | COT - RSMH - Mobile/Mod Home Gas | N/A | Not Applicable | |
07/26/2023 | COT - RSMH - Mobile/Mod Home Plumbing | N/A | Not Applicable | |
07/26/2023 | COT - RSPL - Backwater Valve | N/A | Not Applicable | |
07/26/2023 | COT - RSPL - Gas Final | N/A | Not Applicable | |
07/26/2023 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable | |
07/26/2023 | COT - RSPL - Gas Reconnect | N/A | Not Applicable | |
07/26/2023 | RSBU - Building Progress | N/A | Not Applicable | 7/26/23: duplicate |
07/26/2023 | RSEL - Electrical Progress | N/A | Not Applicable | 7/26/23: duplicate |
07/26/2023 | RSME - Mechanical Progress | N/A | Not Applicable | 7/26/23: duplicate |
07/26/2023 | RSPL - Plumbing Progress | N/A | Not Applicable | 7/26/23: duplicate |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0123-00330
Permit Description: SFR model Plan Alum 1585R
Total Completed Inspections - 17
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/02/2023 | COT - RSPL - Rough Soil | Passed | duplicate | |
03/02/2023 | COT - RSPL - Sewer | Passed | duplicate | |
03/02/2023 | COT - RSPL - Yard Water Line | Passed | duplicate | |
03/17/2023 | COT - RSBU - Preslab | Passed | Compaction of soil is complete, wire mesh reinforcement is in place, plumbing pipes are properly wrapped. Okay to pour concrete slab. | |
03/17/2023 | COT - RSEL - Grounding/Bonding | Passed | #4 copper wire connected to 20' piece of rebar for user ground. | |
04/19/2023 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
04/19/2023 | COT - RSBU - Roof Nailing | Passed | ||
05/04/2023 | BULD - Electrical Clearance | Passed | Approved, ECO clearance to TEP is required for the new service | |
05/04/2023 | COT - RSEL - Electrical Underground | Passed | Approved underground electrical for both homes, okay to backfill progress areas | |
05/10/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Approved. Corrections have been made. 5/10/2023 | |
07/26/2023 | COT - RSEL - Outdoor Lighting | Passed | ||
07/26/2023 | COT - RSBU - Interior Shear Bracing | Passed | ||
07/26/2023 | RSBU - Building Final | Passed | ||
07/26/2023 | COT - RSEL - Electrical Final | Passed | ||
07/26/2023 | COT - RSME - Mechanical Final | Passed | ||
07/26/2023 | COT - RSPL - Plumbing Final | Passed | ||
07/28/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed |