Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
Permit Number - TC-MDP-0123-00330
Inspection Description - COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
Inspection Status - Re-inspection required
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/03/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | 5-3-23: 1-The grounding electrode conductor for 1619 is spliced inside the service for 1617; This is not allowed per IRC E3610.1. 2-Window in Bedroom Four in not per approved plans. 3-Staggered stud walls need vertical fire locking at 10' maximum spacing per IRC R302.11#1.2. | |
05/08/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Partial Pass | Partial pass. 1-Connect grounding electrode conductor from disconnect to grounding electrode conductor from service with irreversible crimp or exit her mic weld. 2-Connect service panel to newly installed ground rods. 5/8/2023 | |
05/10/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Approved. Corrections have been made. 5/10/2023 |