Permit Reviews

Permit Number - TC-MDP-0123-00302
Permit Status: Issued
Permit Description: SFR PANT2022 T22-M0073
Start Date Submittal Complete Date Status  
09/28/2023 SITE FROM MODEL PERMIT - PRODUCTION v.1 10/03/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0123-00302
Permit Status: Issued
Permit Description: SFR PANT2022 T22-M0073
Total Outstanding Activity Conditions - 3
Date Name
03/15/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
03/15/2024 Post-Tension Inspection Report is required.
06/15/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.

Conditions

Permit Number - TC-MDP-0123-00302
Permit Status: Issued
Permit Description: SFR PANT2022 T22-M0073
Date Description Comments
06/15/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
10/02/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Issued
Permit Number: TC-MDP-0123-00302
Permite Description: SFR PANT2022 T22-M0073
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
12/26/2023 COT - RSPL - Sewer N/A Canceled Canceled per wet soils. 12/26/2023
12/26/2023 COT - RSPL - Backwater Valve N/A Canceled Canceled per wet soils. 12/26/2023
08/27/2024 COT - BULD - SWG Clearance N/A Not Applicable
08/27/2024 COT - RSPL - Gas Pressure Test N/A Not Applicable

Completed Inspections

Permit Status: Issued
Permit Number: TC-MDP-0123-00302
Permit Description: SFR PANT2022 T22-M0073
Total Completed Inspections - 14
Date Description Inspector Results Comments
11/21/2023 COT - RSPL - Rough Soil Passed
11/27/2023 COT - RSPL - Yard Water Line Passed
11/29/2023 COT - RSEL - Grounding/Bonding Passed Ufer ground is in place okay to pour concrete footings and slab.
11/29/2023 COT - RSBU - Preslab Passed Rebar reinforcement is in place, post tension cabling is installed and inspected by a third party inspector, all plumbing pipes are properly wrapped for protection from concrete. Okay to pour concrete footings and slab on grade.
11/29/2023 COT - RSBU - Excavation/Rebar/Zoning Passed Rebar reinforcement is in place, post tension cabling is installed and inspected by a third party inspector, all plumbing pipes are properly wrapped for protection from concrete. Okay to pour concrete footings and slab on grade.
12/28/2023 COT - RSPL - Sewer Passed
12/28/2023 COT - RSPL - Backwater Valve Passed
01/12/2024 COT - RSBU - Roof Nailing Passed Shear wall clips are properly nailed off, H2.5 clips are installed on all trusses and connected to top plate of walls, all exterior walls are properly secured to floor, all exterior shear wall sheathing is properly nailed. Roof sheathing is properly nailed to trusses. Okay to proceed with drying in exterior walls and roof.
01/12/2024 COT - RSBU - Exterior Clips/Sheathing Passed Shear wall clips are properly nailed off, H2.5 clips are installed on all trusses and connected to top plate of walls, all exterior walls are properly secured to floor, all exterior shear wall sheathing is properly nailed. Okay to proceed with drying in exterior walls and roof.
01/31/2024 BULD - Electrical Clearance Passed TEP ECO
01/31/2024 COT - RSEL - Electrical Underground Passed
03/08/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Mechanical, electrical, and plumbing rough-in is complete. All penetration are foamed and piping/wire protection is in place were needed. Okay to proceed with installation of insulation and drywall.
03/27/2024 COT - RSBU - Interior Shear Bracing Passed
09/09/2024 COT - RSEL - Outdoor Lighting Passed Outdoor lighting is fully operational and installed per plans and city regulations.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
SI CERT LOT 23_V1.PDF DOCUMENTS VIEW