Permit: TC-MDP-0123-00283
Permit Details
Apply Date:
07/31/2023
Applicant:
Richard Willard
Description:
LE23001 T22-M0058
Permit Reviews
Permit Number - TC-MDP-0123-00283
Permit Status: Inspections complete
Permit Description: LE23001 T22-M0058
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
08/02/2023 | RESIDENTIAL NEW DWELLING v.1 | 08/03/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0123-00283
Permit Status: Inspections complete
Permit Description: LE23001 T22-M0058
Total Outstanding Activity Conditions - 5
Date | Name |
---|---|
07/10/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
08/02/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
08/02/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
08/02/2023 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
08/02/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Conditions
Permit Number - TC-MDP-0123-00283
Permit Status: Inspections complete
Permit Description: LE23001 T22-M0058
Date | Description | Comments |
---|---|---|
07/10/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
08/02/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0123-00283
Permite Description: LE23001 T22-M0058
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/29/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Re-inspection required | Revise plans to show current plumbing and electrical layout. Provide updated city stamped plans at final. Proceed at risk. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0123-00283
Permit Description: LE23001 T22-M0058
Total Completed Inspections - 25
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/23/2023 | COT - RSPL - Sewer | Passed | ||
08/23/2023 | COT - RSPL - Yard Water Line | Passed | ||
08/24/2023 | COT - RSPL - Rough Soil | Passed | ||
09/12/2023 | COT - RSBU - Preslab | Passed | ||
09/12/2023 | COT - RSEL - Electrical Underground | Passed | ||
09/12/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
09/29/2023 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
09/29/2023 | COT - RSBU - Roof Nailing | Passed | ||
11/29/2023 | RSEL - Electrical Progress | Passed | ||
11/29/2023 | RSME - Mechanical Progress | Passed | ||
11/29/2023 | RSPL - Plumbing Progress | Passed | ||
12/08/2023 | BULD - Electrical Clearance | Passed | ||
12/13/2023 | COT - RSBU - Interior Shear Bracing | Passed | ||
02/15/2024 | COT - BULD - SWG Clearance | Passed | ||
03/11/2024 | ENGR Engineering Final | Passed | Note, 1 ) cut down clean out 2 ) electric panel has broken bottom hinge |
|
03/11/2024 | RSBU - Building Progress | Passed | Building construction, mechanical, electrical, and plumbing are complete. All mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled, GFCI and AFCI breakers are installed and working correctly. Bottom hinge on electrical panel needs a screw to secure it to the panel. Okay to issue Certificate of Occupancy for this permit. | |
03/11/2024 | RSBU - Building Final | Passed | Building construction, mechanical, electrical, and plumbing are complete. All mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled, GFCI and AFCI breakers are installed and working correctly. Bottom hinge on electrical panel needs a screw to secure it to the panel. Okay to issue Certificate of Occupancy for this permit. | |
03/11/2024 | COT - RSEL - Electrical Final | Passed | Building construction, mechanical, electrical, and plumbing are complete. All mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled, GFCI and AFCI breakers are installed and working correctly. Bottom hinge on electrical panel needs a screw to secure it to the panel. Okay to issue Certificate of Occupancy for this permit. | |
03/11/2024 | COT - RSEL - Grounding/Bonding | Passed | Ufer ground connected to ground lug in panel. | |
03/11/2024 | COT - RSEL - Outdoor Lighting | Passed | Outdoor lights are installed per plan and operational. | |
03/11/2024 | COT - RSME - Mechanical Final | Passed | Building construction, mechanical, electrical, and plumbing are complete. All mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled, GFCI and AFCI breakers are installed and working correctly. Bottom hinge on electrical panel needs a screw to secure it to the panel. Okay to issue Certificate of Occupancy for this permit. | |
03/11/2024 | COT - RSPL - Gas Final | Passed | Gas appliances are installed and operational. SWG has installed meter and turned gas on to residence. | |
03/11/2024 | COT - RSPL - Gas Pressure Test | Passed | Passed 11/29/23 by Ricky O. | |
03/11/2024 | COT - RSPL - Plumbing Final | Passed | Building construction, mechanical, electrical, and plumbing are complete. All mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled, GFCI and AFCI breakers are installed and working correctly. Bottom hinge on electrical panel needs a screw to secure it to the panel. Okay to issue Certificate of Occupancy for this permit. | |
06/07/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed |