Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
06/28/2023
Applicant:
Phillip Midder
Description:
SFR LE23001 T22-M0058

Permit Reviews

Permit Number - TC-MDP-0123-00282
Permit Status: Inspections complete
Permit Description: SFR LE23001 T22-M0058
Start Date Submittal Complete Date Status  
07/10/2023 RESIDENTIAL NEW DWELLING v.1 07/12/2023 APPROVED Review Details
06/30/2023 RESIDENTIAL NEW DWELLING v.1 07/05/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0123-00282
Permit Status: Inspections complete
Permit Description: SFR LE23001 T22-M0058
Total Outstanding Activity Conditions - 4
Date Name
06/30/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
06/30/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
06/30/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
07/03/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Conditions

Permit Number - TC-MDP-0123-00282
Permit Status: Inspections complete
Permit Description: SFR LE23001 T22-M0058
Date Description Comments
06/30/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0123-00282
Permite Description: SFR LE23001 T22-M0058
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
11/07/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Partial Pass Add clean outs or partial pass, proceed at risk, and revise plans to show current plumbing layout and show at final, revise plans to show current electrical layout.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0123-00282
Permit Description: SFR LE23001 T22-M0058
Total Completed Inspections - 25
Date Description Inspector Results Comments
08/08/2023 COT - RSPL - Rough Soil Passed
08/08/2023 COT - RSPL - Sewer Passed
08/08/2023 COT - RSPL - Yard Water Line Passed
08/25/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
08/25/2023 COT - RSBU - Preslab Passed
08/25/2023 COT - RSEL - Electrical Underground Passed
09/14/2023 COT - RSBU - Exterior Clips/Sheathing Passed 9/14/23 Missing one anchor bolt east side shear wall in garage. Will check at intermediate
09/14/2023 COT - RSBU - Roof Nailing Passed
11/07/2023 RSBU - Building Progress Passed
11/07/2023 COT - RSEL - Grounding/Bonding Passed
11/07/2023 COT - RSPL - Gas Pressure Test Passed
11/07/2023 RSEL - Electrical Progress Passed
11/07/2023 RSME - Mechanical Progress Passed
11/07/2023 RSPL - Plumbing Progress Passed
11/28/2023 BULD - Electrical Clearance Passed 12/13/2023 clearance resent to TEP
11/29/2023 COT - RSBU - Interior Shear Bracing Passed
01/25/2024 COT - BULD - SWG Clearance Passed
02/08/2024 COT - RSPL - Plumbing Final Passed
02/08/2024 COT - RSPL - Gas Final Passed
02/08/2024 COT - RSME - Mechanical Final Passed
02/08/2024 COT - RSEL - Outdoor Lighting Passed
02/08/2024 COT - RSEL - Electrical Final Passed
02/08/2024 RSBU - Building Final Passed
02/08/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
02/12/2024 ENGR Engineering Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CLE 3001 LENNAR LETTERHEAD_V1.PDF DOCUMENTS VIEW
LEC 3001 OK TO PERMIT WITH REVISED FRONT SET BACK TO 20'_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CLE 3001 OK TO PERMIT_V1.PDF DOCUMENTS VIEW
LE2_2_3001, 3001 MODEL MASTER_V1.PDF DOCUMENTS VIEW
LE2_2_3001, 3001 SIC-2023-06-28_V1.PDF DOCUMENTS VIEW