Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/08/2024 | ENGR Engineering Final | Not Ready | 1) Clean-outs need to be cut down to grade so only caps are showing. 2) Porta-Jon needs to be relocated out of street and staked down. 3) Please ensure all Not Ready inspections are called in for a re-inspect. |
|
| 02/12/2024 | ENGR Engineering Final | Passed |