Permit: TC-MDP-0123-00251
Permit Details
Apply Date:
04/20/2023
Applicant:
Richard Willard
Description:
SFR LE23004 T22-M0055
Permit Reviews
Permit Number - TC-MDP-0123-00251
Permit Status: Complete
Permit Description: SFR LE23004 T22-M0055
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
05/10/2023 | RESIDENTIAL NEW DWELLING v.1 | 05/15/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0123-00251
Permit Status: Complete
Permit Description: SFR LE23004 T22-M0055
Total Outstanding Activity Conditions - 7
Date | Name |
---|---|
05/15/2023 | Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents. |
05/15/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
05/15/2023 | Post-Installed Anchor Inspection Report is required. |
05/15/2023 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
05/15/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
07/13/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
07/13/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0123-00251
Permite Description: SFR LE23004 T22-M0055
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/26/2023 | COT - RSPL - Plumbing Final | N/A | Not Ready |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0123-00251
Permit Description: SFR LE23004 T22-M0055
Total Completed Inspections - 24
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/20/2023 | COT - RSPL - Rough Soil | Passed | ||
06/20/2023 | COT - RSPL - Sewer | Passed | ||
06/20/2023 | COT - RSPL - Yard Water Line | Passed | ||
07/10/2023 | COT - RSEL - Electrical Underground | Passed | 7/10/23: Electrical conduit is installed for kitchen island. Okay to pour concrete slab. | |
07/10/2023 | COT - RSBU - Preslab | Passed | 7-10-23: Ufer ground is in place and tied to the rebar reinforcement. Monolithic footings are properly dug with rebar reinforcement in place. Post tension cabling is installed per plans. Subsoil is compacted and ready for concrete pour. | |
07/10/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 7-10-23: Ufer ground is in place and tied to the rebar reinforcement. Monolithic footings are properly dug with rebar reinforcement in place. Post tension cabling is installed per plans. Subsoil is compacted and ready for concrete pour. | |
07/10/2023 | COT - RSEL - Grounding/Bonding | Passed | Ufer ground is in place and tied to the rebar reinforcement. Monolithic footings are properly dug with rebar reinforcement in place. Post tension cabling is installed per plans. Subsoil is compacted and ready for concrete pour. | |
07/26/2023 | COT - RSBU - Roof Nailing | Passed | ||
08/23/2023 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
09/26/2023 | RSBU - Building Progress | Passed | ||
09/26/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
09/26/2023 | RSEL - Electrical Progress | Passed | ||
09/26/2023 | RSME - Mechanical Progress | Passed | ||
09/26/2023 | RSPL - Plumbing Progress | Passed | ||
09/27/2023 | COT - RSPL - Gas Pressure Test | Passed | ||
10/06/2023 | COT - RSBU - Interior Shear Bracing | Passed | ||
12/15/2023 | COT - BULD - SWG Clearance | Passed | ||
12/15/2023 | BULD - Electrical Clearance | Passed | ||
01/08/2024 | COT - RSEL - Electrical Final | Passed | ||
01/08/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
01/08/2024 | COT - RSPL - Gas Final | Passed | ||
01/12/2024 | RSBU - Building Final | Passed | ||
01/12/2024 | COT - RSME - Mechanical Final | Passed | ||
01/12/2024 | COT - RSPL - Plumbing Final | Passed |