Permit: TC-MDP-0123-00236
Permit Details
Apply Date:
09/20/2023
Applicant:
Craig Morczynski
Description:
SFR LENNLE4002 T22-M0046
Permit Reviews
Permit Number - TC-MDP-0123-00236
Permit Status: Inspections complete
Permit Description: SFR LENNLE4002 T22-M0046
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
09/21/2023 | RESIDENTIAL NEW DWELLING v.1 | 09/21/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0123-00236
Permit Status: Inspections complete
Permit Description: SFR LENNLE4002 T22-M0046
Total Outstanding Activity Conditions - 6
Date | Name |
---|---|
07/14/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
09/21/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
09/21/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
09/21/2023 | Post-Tension Inspection Report is required. |
09/21/2023 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
09/21/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Conditions
Permit Number - TC-MDP-0123-00236
Permit Status: Inspections complete
Permit Description: SFR LENNLE4002 T22-M0046
Date | Description | Comments |
---|---|---|
09/25/2023 | The Contractor you have added to your permit cannot be verified. Please contact staff to have the ROC number added to the account. | |
07/14/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0123-00236
Permite Description: SFR LENNLE4002 T22-M0046
Total Outstanding Inspections - 2
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/04/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Re-inspection required | Secure gas lines ceiling throughout house VTR in master bath not secured Nail plates master bath shower lines missing bored too close to edge Fire foam dead spots and penetrations Tub not under test Water lines not under test Fresh air within 10ft min from vtr in bath. |
03/04/2024 | RSBU - Building Progress | N/A | Re-inspection required | Secure gas lines ceiling throughout house VTR in master bath not secured Nail plates master bath shower lines missing bored too close to edge Fire foam dead spots and penetrations Tub not under test Water lines not under test Fresh air within 10ft min from vtr in bath. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0123-00236
Permit Description: SFR LENNLE4002 T22-M0046
Total Completed Inspections - 21
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/08/2023 | COT - RSPL - Rough Soil | Passed | ||
11/08/2023 | COT - RSPL - Sewer | Passed | ||
11/08/2023 | COT - RSPL - Yard Water Line | Passed | ||
11/15/2023 | COT - RSBU - Preslab | Passed | ||
11/15/2023 | COT - RSEL - Electrical Underground | Passed | ||
11/15/2023 | COT - RSEL - Grounding/Bonding | Passed | ||
11/15/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
12/18/2023 | COT - RSBU - Exterior Clips/Sheathing | Passed | All H2.5 clips are properly installed on roof rafters. All hold downs are properly nailed to wall studs. All straps are properly nailed off. Plywood sheathing for exterior and interior shear walls are properly nailed per plan. Okay to proceed with exterior stucco prep and roof dry-in. | |
12/18/2023 | COT - RSBU - Roof Nailing | Passed | ||
02/29/2024 | BULD - Electrical Clearance | Passed | ||
03/04/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
03/06/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
03/06/2024 | RSBU - Building Progress | Passed | ||
03/18/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
05/14/2024 | COT - BULD - SWG Clearance | Passed | ||
05/23/2024 | COT - RSEL - Electrical Final | Passed | ||
05/23/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
05/23/2024 | COT - RSME - Mechanical Final | Passed | ||
05/23/2024 | COT - RSPL - Plumbing Final | Passed | ||
05/23/2024 | ENGR Engineering Final | Passed | ||
05/23/2024 | RSBU - Building Final | Passed |