Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
12/05/2023
Applicant:
Craig Morczynski
Description:
SFR LENNLE4005 T22-M0049

Permit Reviews

Permit Number - TC-MDP-0123-00206
Permit Status: Inspections complete
Permit Description: SFR LENNLE4005 T22-M0049
Start Date Submittal Complete Date Status  
12/05/2023 SITE FROM MODEL PERMIT - PRODUCTION v.1 12/12/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0123-00206
Permit Status: Inspections complete
Permit Description: SFR LENNLE4005 T22-M0049
Total Outstanding Activity Conditions - 6
Date Name
07/14/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
12/05/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
12/05/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
12/06/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
12/06/2023 Post-Tension Inspection Report is required.
12/06/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Conditions

Permit Number - TC-MDP-0123-00206
Permit Status: Inspections complete
Permit Description: SFR LENNLE4005 T22-M0049
Date Description Comments
07/14/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0123-00206
Permit Description: SFR LENNLE4005 T22-M0049
Total Completed Inspections - 21
Date Description Inspector Results Comments
01/17/2024 COT - RSPL - Sewer Passed
01/17/2024 COT - RSPL - Yard Water Line Passed
01/18/2024 COT - RSPL - Rough Soil Passed
02/07/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
02/07/2024 COT - RSBU - Preslab Passed
02/07/2024 COT - RSEL - Electrical Underground Passed
02/07/2024 COT - RSEL - Grounding/Bonding Passed
02/29/2024 COT - RSBU - Roof Nailing Passed
04/09/2024 BULD - Electrical Clearance Passed
04/18/2024 COT - RSBU - Exterior Clips/Sheathing Passed
04/18/2024 COT - RSPL - Gas Pressure Test Passed
04/18/2024 RSBU - Building Progress Passed
04/26/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
05/07/2024 COT - RSBU - Interior Shear Bracing Passed
07/29/2024 COT - BULD - SWG Clearance Passed SWG for meter only
08/13/2024 COT - RSEL - Outdoor Lighting Passed
08/13/2024 ENGR Engineering Final Passed Move in ready, please post address.
08/14/2024 COT - RSEL - Electrical Final Passed
08/14/2024 COT - RSME - Mechanical Final Passed
08/14/2024 COT - RSPL - Plumbing Final Passed
08/14/2024 RSBU - Building Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LE II 17 OK TO PERMIT WITH SECOND WATER METER REMOVED_V1.PDF DOCUMENTS VIEW
LE II 17 SIC-2023-12-05_V1.PDF DOCUMENTS VIEW