Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Factory Built Buildings
Address:
10000 S RITA RD
Address NEW:
10000 S RITA RD
Apply Date:
12/19/2023
Applicant:
Emmanuel Denis
Description:
AZ800 Roadrunner Reserve Battery Energy Storage System (BESS), for (TEP) the owner, DP # TD-DEV-0723-00309. Temporary Use Permit: TZ-PMT-1223-00128. Utility Power utilized on temporary trailers to support construction.

Permit Reviews

Permit Number - TC-FBB-1223-00029
Permit Status: Issued
Permit Description: AZ800 Roadrunner Reserve Battery Energy Storage System (BESS), for (TEP) the owner, DP # TD-DEV-0723-00309. Temporary Use Permit: TZ-PMT-1223-00128. Utility Power utilized on temporary trailers to support construction.
Start Date Submittal Complete Date Status  
01/18/2024 FACTORY BUILT BUILDINGS v.4 01/18/2024 APPROVED Review Details
01/08/2025 FACTORY BUILT BUILDINGS REVISION v.1 01/29/2025 APPROVED Review Details
01/18/2024 FACTORY BUILT BUILDINGS v.3 01/18/2024 REQUIRES RESUBMIT Review Details
12/20/2023 FACTORY BUILT BUILDINGS v.1 01/02/2024 REQUIRES RESUBMIT Review Details
01/05/2024 FACTORY BUILT BUILDINGS v.2 01/17/2024 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TC-FBB-1223-00029
Permit Status: Issued
Permit Description: AZ800 Roadrunner Reserve Battery Energy Storage System (BESS), for (TEP) the owner, DP # TD-DEV-0723-00309. Temporary Use Permit: TZ-PMT-1223-00128. Utility Power utilized on temporary trailers to support construction.
Total Outstanding Activity Conditions - 1
Date Name
01/23/2025 Please submit a separate sign permit for an signs associated with this projet.

Conditions

Permit Number - TC-FBB-1223-00029
Permit Status: Issued
Permit Description: AZ800 Roadrunner Reserve Battery Energy Storage System (BESS), for (TEP) the owner, DP # TD-DEV-0723-00309. Temporary Use Permit: TZ-PMT-1223-00128. Utility Power utilized on temporary trailers to support construction.
Date Description Comments
12/20/2023 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
01/22/2024 Prior to Issuance: This project requires issuance of a Development Package (DP) permit prior to issuance of this permit. Prior to TCO/Final: This project requires full completion of a Development Package (DP) permit prior to Temporary C of O and/or final completion this permit.

Outstanding Inspections

Permit Status: Issued
Permit Number: TC-FBB-1223-00029
Permite Description: AZ800 Roadrunner Reserve Battery Energy Storage System (BESS), for (TEP) the owner, DP # TD-DEV-0723-00309. Temporary Use Permit: TZ-PMT-1223-00128. Utility Power utilized on temporary trailers to support construction.
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
02/21/2024 COT - RSPL - Plumbing Final N/A Not Applicable

Completed Inspections

Permit Status: Issued
Permit Number: TC-FBB-1223-00029
Permit Description: AZ800 Roadrunner Reserve Battery Energy Storage System (BESS), for (TEP) the owner, DP # TD-DEV-0723-00309. Temporary Use Permit: TZ-PMT-1223-00128. Utility Power utilized on temporary trailers to support construction.
Total Completed Inspections - 4
Date Description Inspector Results Comments
02/21/2024 COT - RSEL - Electrical Final Passed
02/21/2024 BULD - Electrical Clearance Passed 2/21/24: passed ok to power on generators.
02/21/2024 COT - RSME - Mechanical Final Passed
02/21/2024 RSBU - Building Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
ROADRUNNER RESERVE - OVERALL SITE PLAN - LETTER_TAGS_SITE PLAN_V4.PDF DOCUMENTS VIEW