Permit Details

Status:
Issued
Type:
Factory Built Buildings
Apply Date:
02/05/2024
Applicant:
Caleb Gaub
Description:
-THIS PROJECT CONSISTS OF A TEMPORARY, WOOD WALK-WAY AND UTILITY CONNECTIONS FOR A STERIS MOBILE SPD TRAILER SYSTEM. THE TRAILER WILL BE INSTALLED IN THE PARKING ARE JUST WEST OF THE MAIN HOSPITAL, OUTSIDE THE AREA OF THE NEW MAIN LAB IN TOWERS 3 AND 4.

Permit Reviews

Permit Number - TC-FBB-0224-00011
Permit Status: Issued
Permit Description: -THIS PROJECT CONSISTS OF A TEMPORARY, WOOD WALK-WAY AND UTILITY CONNECTIONS FOR A STERIS MOBILE SPD TRAILER SYSTEM. THE TRAILER WILL BE INSTALLED IN THE PARKING ARE JUST WEST OF THE MAIN HOSPITAL, OUTSIDE THE AREA OF THE NEW MAIN LAB IN TOWERS 3 AND 4.
Start Date Submittal Complete Date Status  
04/15/2024 FACTORY BUILT BUILDINGS v.4 04/29/2024 REQUIRES RESUBMIT Review Details
05/23/2024 FACTORY BUILT BUILDINGS v.5 06/04/2024 APPROVED Review Details
06/04/2024 RESTAMP - RESIDENTIAL v.1 06/05/2024 APPROVED Review Details
03/21/2024 FACTORY BUILT BUILDINGS v.2 03/21/2024 REQUIRES RESUBMIT Review Details
02/06/2024 FACTORY BUILT BUILDINGS v.1 02/23/2024 REQUIRES RESUBMIT Review Details
03/21/2024 FACTORY BUILT BUILDINGS v.3 04/05/2024 REQUIRES RESUBMIT Review Details

Outstanding Inspections

Permit Status: Issued
Permit Number: TC-FBB-0224-00011
Permite Description: -THIS PROJECT CONSISTS OF A TEMPORARY, WOOD WALK-WAY AND UTILITY CONNECTIONS FOR A STERIS MOBILE SPD TRAILER SYSTEM. THE TRAILER WILL BE INSTALLED IN THE PARKING ARE JUST WEST OF THE MAIN HOSPITAL, OUTSIDE THE AREA OF THE NEW MAIN LAB IN TOWERS 3 AND 4.
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
09/05/2024 RSPL - Plumbing Progress N/A Partial Pass partial pass for temp sewer line approximately 100’ long for SPD trailer, ok to cover
09/13/2024 COT - RSPL - Sewer N/A Partial Pass Interior sewer line (4”) to be connected to main exterior sewer line.

Completed Inspections

Permit Status: Issued
Permit Number: TC-FBB-0224-00011
Permit Description: -THIS PROJECT CONSISTS OF A TEMPORARY, WOOD WALK-WAY AND UTILITY CONNECTIONS FOR A STERIS MOBILE SPD TRAILER SYSTEM. THE TRAILER WILL BE INSTALLED IN THE PARKING ARE JUST WEST OF THE MAIN HOSPITAL, OUTSIDE THE AREA OF THE NEW MAIN LAB IN TOWERS 3 AND 4.
Total Completed Inspections - 2
Date Description Inspector Results Comments
07/15/2024 COT - RSBU - Exterior Clips/Sheathing Passed Exterior walls of woos structure for storage of support equipment for trailer to be installed.
07/15/2024 COT - RSBU - Roof Nailing Passed Ok to dry-in roof system.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BUMCT TEMP SPD TRAILER_COLLATED_PERMIT_SET_V5_V5.PDF DOCUMENTS VIEW
BUMCT TEMP SPD TRAILER_COLLATED_PERMIT_SET_V5_V5.PDF DOCUMENTS VIEW