Permit: TC-FBB-0224-00011
Permit Details
Apply Date:
02/05/2024
Applicant:
Jared Duvall
Description:
-THIS PROJECT CONSISTS OF A TEMPORARY, WOOD WALK-WAY AND UTILITY CONNECTIONS FOR A STERIS MOBILE SPD TRAILER SYSTEM. THE TRAILER WILL BE INSTALLED IN THE PARKING ARE JUST WEST OF THE MAIN HOSPITAL, OUTSIDE THE AREA OF THE NEW MAIN LAB IN TOWERS 3 AND 4.
Permit Reviews
Permit Number - TC-FBB-0224-00011
Permit Status: Issued
Permit Description: -THIS PROJECT CONSISTS OF A TEMPORARY, WOOD WALK-WAY AND UTILITY CONNECTIONS FOR A STERIS MOBILE SPD TRAILER SYSTEM. THE TRAILER WILL BE INSTALLED IN THE PARKING ARE JUST WEST OF THE MAIN HOSPITAL, OUTSIDE THE AREA OF THE NEW MAIN LAB IN TOWERS 3 AND 4.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
04/15/2024 | FACTORY BUILT BUILDINGS v.4 | 04/29/2024 | REQUIRES RESUBMIT |
05/23/2024 | FACTORY BUILT BUILDINGS v.5 | 06/04/2024 | APPROVED |
06/04/2024 | RESTAMP - RESIDENTIAL v.1 | 06/05/2024 | APPROVED |
03/21/2024 | FACTORY BUILT BUILDINGS v.2 | 03/21/2024 | REQUIRES RESUBMIT |
02/06/2024 | FACTORY BUILT BUILDINGS v.1 | 02/23/2024 | REQUIRES RESUBMIT |
03/21/2024 | FACTORY BUILT BUILDINGS v.3 | 04/05/2024 | REQUIRES RESUBMIT |
Completed Inspections
Permit Status: Issued
Permit Number: TC-FBB-0224-00011
Permit Description: -THIS PROJECT CONSISTS OF A TEMPORARY, WOOD WALK-WAY AND UTILITY CONNECTIONS FOR A STERIS MOBILE SPD TRAILER SYSTEM. THE TRAILER WILL BE INSTALLED IN THE PARKING ARE JUST WEST OF THE MAIN HOSPITAL, OUTSIDE THE AREA OF THE NEW MAIN LAB IN TOWERS 3 AND 4.
Total Completed Inspections - 9
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/15/2024 | COT - RSBU - Roof Nailing | Passed | Ok to dry-in roof system. | |
10/14/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | Ok to cover roof system. | |
10/28/2024 | COT - RSPL - Sewer | Passed | ||
10/28/2024 | RSPL - Plumbing Progress | Passed | ||
10/31/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
10/31/2024 | COT - RSEL - Electrical Underground | Passed | ||
10/31/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
10/31/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
11/08/2024 | COT - RSEL - Electrical Final | Passed |