Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Commercial Building
Address NEW:
5115 E VALENCIA RD
Apply Date:
12/17/2025
Applicant:
Joshua Hargrave
Description:
Includes reorganization of existing kitchen equipment and addition of new fryer units. The existing type 1 hood and wrapped ducts will be replaced with Type 1 new equipment. Rooftop equipment will remain existing.

Permit Reviews

Permit Number - TC-COM-1225-02275
Permit Status: Inspections
Permit Description: Includes reorganization of existing kitchen equipment and addition of new fryer units. The existing type 1 hood and wrapped ducts will be replaced with Type 1 new equipment. Rooftop equipment will remain existing.
Start Date Submittal Complete Date Status  
12/19/2025 COMMERCIAL REVIEW - FULL v.1 01/15/2026 REQUIRES RESUBMIT Review Details
02/09/2026 COMMERCIAL REVIEW - FULL v.3 03/04/2026 APPROVED Review Details
03/04/2026 RESTAMP - COMMERCIAL v.1 03/09/2026 APPROVED Review Details
01/28/2026 COMMERCIAL REVIEW - FULL v.2 01/28/2026 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TC-COM-1225-02275
Permit Status: Inspections
Permit Description: Includes reorganization of existing kitchen equipment and addition of new fryer units. The existing type 1 hood and wrapped ducts will be replaced with Type 1 new equipment. Rooftop equipment will remain existing.
Total Outstanding Activity Conditions - 1
Date Name
01/12/2026 AIR BALANCING REPORT IS REQUIRED.

Conditions

Permit Number - TC-COM-1225-02275
Permit Status: Inspections
Permit Description: Includes reorganization of existing kitchen equipment and addition of new fryer units. The existing type 1 hood and wrapped ducts will be replaced with Type 1 new equipment. Rooftop equipment will remain existing.
Date Description Comments
12/19/2025 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
12/19/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Outstanding Inspections

Permit Status: Inspections
Permit Number: TC-COM-1225-02275
Permite Description: Includes reorganization of existing kitchen equipment and addition of new fryer units. The existing type 1 hood and wrapped ducts will be replaced with Type 1 new equipment. Rooftop equipment will remain existing.
Total Outstanding Inspections - 9
Last Inspection Date Description Inspector Results Comments
04/14/2026 COT - LCBU - Preslab N/A Re-inspection required 4-14-26: please schedule pour back inspection to verify 6" embedment of dowels.
COT - LCME - Mechanical Final N/A Requested
COT - FCON - Fire - Final N/A Requested
COT - LCEL - Electrical Final N/A Requested
COT - LCPL - Plumbing Final N/A Requested
COT - LCBU - Building Final N/A Requested
COT - LCEL - Electrical Above Ceiling N/A Requested
COT - FCON - Hood System - Final N/A Requested
04/14/2026 COT - LCME - Kitchen Hood N/A Partial Pass 4-14-26: smoke test approved-okay to wrap.

Completed Inspections

Permit Status: Inspections
Permit Number: TC-COM-1225-02275
Permit Description: Includes reorganization of existing kitchen equipment and addition of new fryer units. The existing type 1 hood and wrapped ducts will be replaced with Type 1 new equipment. Rooftop equipment will remain existing.
Total Completed Inspections - 5
Date Description Inspector Results Comments
04/14/2026 COT - LCME - Mechanical Intermediate Passed 4-14-26: mechanical intermediates approved.
04/14/2026 COT - LCEL - Electrical Intermediate Passed 4-14-26: electrical intermediates approved.
04/14/2026 COT - LCPL - Plumbing Intermediate Passed 4-14-26: plumbing intermediates approved.
04/14/2026 COT - LCPL - Rough Soil Passed 4-14-26: underground plumbing verified under test. Okay to backfill using shading materials.
04/14/2026 COT - LCBU - Preslab Passed 4-14-26: verified dowels- okay for pour back.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
CONS-05-1499 TCNK FRYER 25-1124_V2.PDF DOCUMENTS VIEW
05-1499 RESPONSE LETTER_V1.PDF DOCUMENTS VIEW
QT 1499 HOOD LETTER - AZ 7-21-25_V1.PDF DOCUMENTS VIEW