Permit: TC-COM-1225-02249
Permit Details
Apply Date:
12/12/2025
Applicant:
Ashley Benjamin
Description:
Tenant improvement of an existing bank branch with interior updates; use remains the same. Includes minor renovations and a new trash enclosure on the property.
Permit Reviews
Permit Number - TC-COM-1225-02249
Permit Status: Inspections
Permit Description: Tenant improvement of an existing bank branch with interior updates; use remains the same. Includes minor renovations and a new trash enclosure on the property.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/16/2026 | COMMERCIAL REVIEW - FULL v.2 | 04/08/2026 | APPROVED |
| 12/17/2025 | COMMERCIAL REVIEW - FULL v.1 | 01/08/2026 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-COM-1225-02249
Permit Status: Inspections
Permit Description: Tenant improvement of an existing bank branch with interior updates; use remains the same. Includes minor renovations and a new trash enclosure on the property.
| Date | Description | Comments |
|---|---|---|
| 12/17/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 12/17/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-COM-1225-02249
Permite Description: Tenant improvement of an existing bank branch with interior updates; use remains the same. Includes minor renovations and a new trash enclosure on the property.
Total Outstanding Inspections - 18
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/16/2026 | N/A | Partial Pass | Layout for ADA parking on East side of building: subgrade, slopes, dimensions, and reinforcement are correct. Okay to pour. | |
| 04/16/2026 | COT - LCPL - Rough Soil | N/A | Partial Pass | 4/16/26: Plumbing underground for phase 1 approved. Ok to proceed with backfill |
| 04/16/2026 | COT - LCBU - Excavation/Rebar/Zoning | N/A | Partial Pass | 4/16/26: footing F3.5 in open office approved (RFI required for additional footing in Office), |
| 04/16/2026 | COT - LCEL - Electrical Intermediate | N/A | Partial Pass | 4/16/26: Electrical in wall approved in conference room, open office, print room, pc staging, coin, west hall |
| 06/08/2026 | COT - LCBU - Framing | N/A | Canceled | 6-8-26: canceled by contractor. |
| 06/08/2026 | COT - LCME - Mechanical Final | N/A | Canceled | 6-8-26: canceled by contractor. |
| 06/08/2026 | COT - LCPL - Plumbing Final | N/A | Canceled | 6-8-26: canceled by contractor. |
| 06/08/2026 | COT - LCEL - Electrical Final | N/A | Canceled | 6-8-26: canceled by contractor. |
| 06/24/2026 | COT - LCME - Mechanical Above Ceiling | N/A | Partial Pass | 6.24.26 Phase 1: Rms 110-120; Print room 130;127-137; hallway 151; 124 data closet, rest room 155 and156; hallway 158. Rm 137 facility storage HVAC Split will be looked at in Phase 2. |
| 06/24/2026 | COT - LCME - Mechanical Intermediate | N/A | Partial Pass | |
| 06/24/2026 | COT - HCPL - Plumbing Above Ceiling | N/A | Partial Pass | 6.24.26 Phase 1: Rms 110-120; Print room 130;127-137; hallway 151; 124 data closet, rest room 155 and156; hallway 158. Rm 137 facility storage HVAC Split will be looked at in Phase 2. |
| 06/24/2026 | COT - LCEL - Electrical Above Ceiling | N/A | Partial Pass | 6.24.26 Phase 1: Rms 110-120; Print room 130;127-137; hallway 151; 124 data closet, rest room 155 and156; hallway 158. Rm 137 facility storage HVAC Split will be looked at in Phase 2. |
| 07/15/2026 | BULD - Electrical Clearance | N/A | Not Applicable | |
| 07/15/2026 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
| COT - FCON - Alarm - Final | N/A | Not Ready | Permit for demo of alarm in phase 3 | |
| 07/15/2026 | COT - FCON - Fire - Final | N/A | Partial Pass | Phase 1 approved for level4 tco. phase 2 under construction, phase 3 open for business(contruction not started yet) |
| 07/15/2026 | COT - LCBU - Building Final | N/A | Partial Pass | 7/15/2026 Partial pass. Okay for level 4 TCO. PHASE 1. |
| 07/15/2026 | ENGR Engineering Final | N/A | Partial Pass | Phase one work is complete including new ADA parking spaces. No more exterior work remains. Recall Engineering Final once all work is complete and site is safe and clean. |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-COM-1225-02249
Permit Description: Tenant improvement of an existing bank branch with interior updates; use remains the same. Includes minor renovations and a new trash enclosure on the property.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/17/2026 | COT - LCBU - Masonry Pregrout | Passed | 4/17/26 Pass, final lift. |
|
| 05/06/2026 | COT - LCPL - Plumbing Intermediate | Passed | 5/6/26 passed | |
| 07/15/2026 | TRSP - ROW - Final/Close-Out | Passed | no impact to right of way with work performed |