Permit: TC-COM-1225-02185
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
10100 E OLD VAIL RD
Address NEW:
10100 E OLD VAIL RD
Apply Date:
12/04/2025
Applicant:
Buck Culbreth
Description:
New cold/dark shell
Permit Reviews
Permit Number - TC-COM-1225-02185
Permit Status: Complete
Permit Description: New cold/dark shell
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 11/04/2026 | SPECIAL INSPECTION REVIEW v.1 | 11/06/2026 | APPROVED |
| 11/17/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 11/19/2026 | APPROVED |
| 05/11/2026 | ADMINISTRATIVE v.2 | 05/11/2026 | APPROVED |
| 03/03/2026 | COMMERCIAL REVIEW - FULL v.2 | 03/25/2026 | APPROVED |
| 05/11/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 05/13/2026 | APPROVED |
| 12/09/2025 | COMMERCIAL REVIEW - FULL v.1 | 01/06/2026 | REQUIRES RESUBMIT |
| 04/01/2026 | ADMINISTRATIVE v.1 | 04/01/2026 | REQUIRES RESUBMIT |
| 03/25/2026 | RESTAMP - COMMERCIAL v.1 | 04/01/2026 | APPROVED |
Conditions
Permit Number - TC-COM-1225-02185
Permit Status: Complete
Permit Description: New cold/dark shell
| Date | Description | Comments |
|---|---|---|
| 12/26/2025 | SPECIAL INSPECTION OF CONCRETE IS REQUIRED. | |
| 12/09/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 12/26/2025 | SPECIAL INSPECTION OF MASONRY CONSTRUCTION IS REQUIRED. | |
| 03/24/2026 | Separate submittal to PC Industrial Wastewater Control is required for new interceptors and separators. Contact Kelsey.McMonagle@pima.gov or Adam.DeLaTorre@pima.gov for review and assessment of the proposed grease interceptor. | |
| 12/09/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 12/26/2025 | SPECIAL INSPECTIONOF SOILS IS REQUIRED. | |
| 12/26/2025 | A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit. | |
| 12/26/2025 | SPECIAL INSPECTION OF STEEL CONSTRUCTION IS REQUIRED. | |
| 05/12/2026 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. | |
| 12/26/2025 | SPECIAL INSPECTION OF WOOD CONSTRUCTION IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-1225-02185
Permite Description: New cold/dark shell
Total Outstanding Inspections - 6
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/04/2026 | COT - LCBU - Preslab | N/A | Not Applicable | 9.4.26 Called Field contact name : David McKinney, phone number: 4807375737. No answer. Call trash enclosure and approach is under Development Plan. |
| 11/13/2026 | COT - FCON - Sprinkler - Final | N/A | Not Applicable | |
| 11/13/2026 | COT - LCBU - Stem Wall/Retaining Wall | N/A | Not Applicable | 11/13/26: not applicable |
| 06/02/2026 | COT - LCPL - Plumbing Intermediate | N/A | Not Ready | |
| 11/13/2026 | COT - LCBU - Masonry Pregrout | N/A | Not Applicable | 11/13/26: not applicable |
| 11/13/2026 | COT - HCBU - TCO | N/A | Partial Pass | 11/13/26: pending engineering final & schedule remaining inspections for permit 1225-02199. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-1225-02185
Permit Description: New cold/dark shell
Total Completed Inspections - 23
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/17/2026 | PDSD Building Division Pre-Construction Meeting | Passed | ||
| 09/22/2026 | BULD - Electrical Clearance | Passed | 9/22/26: TEP ECO APPROVED FOR 10100 E OLD VAIL RD | |
| 11/05/2026 | COT - LCPL - Sewer | Passed | 11/5/26: previously inspected & approved. | |
| 11/12/2026 | COT - LCBU - Roof Nailing | Passed | 11/12/26: approved. | |
| 11/12/2026 | COT - LCBU - Excavation/Rebar/Zoning | Passed | 11/12/26: previously inspected & approved. | |
| 11/13/2026 | COT - BULD - SWG Clearance | Passed | 11/12/26: approved. | |
| 11/13/2026 | COT - FCON - Fire - Final | Passed | Approved by W Motto 10/29/2026 | |
| 11/13/2026 | COT - LCEL - Electrical Final | Passed | 11/12/26: approved. | |
| 11/13/2026 | COT - LCME - Kitchen Hood | Passed | 11/13/26: approved. | |
| 11/13/2026 | COT - LCME - Mechanical Final | Passed | 11/12/26: approved. | |
| 11/13/2026 | COT - LCME - Mechanical Intermediate | Passed | 11/12/26: approved. | |
| 11/13/2026 | COT - LCPL - Plumbing Final | Passed | 11/12/26: approved. | |
| 11/13/2026 | COT - LCPL - Plumbing Intermediate | Passed | 11/12/26: approved. | |
| 11/13/2026 | COT - LCPL - Plumbing Roof Drains | Passed | 11/12/26: approved. | |
| 11/13/2026 | COT - LCPL - Rough Soil | Passed | 11/12/26: approved. | |
| 11/13/2026 | COT - LCPL - Yard Water Line | Passed | 11/12/26: approved. | |
| 11/13/2026 | ENGR Engineering Final | Passed | ||
| 11/13/2026 | TRSP - ROW - Notice of Completion | Passed | All work within city right of way has been completed | |
| 11/13/2026 | COT - LCBU - Framing | Passed | 11/13/26: approved. | |
| 11/13/2026 | COT - HCEL - Electrical Underground | Passed | 11/12/26: approved. | |
| 11/13/2026 | COT - LCPL - Gas Pressure Test | Passed | 11/12/26: approved. | |
| 11/18/2026 | COT - HCBU - TCO | Passed | 11.18.26 Shell close-out no TCO needed. |
|
| 11/18/2026 | COT - LCBU - Building Final | Passed |