Permit: TC-COM-1223-02796
Permit Details
Apply Date:
12/07/2023
Applicant:
Erin Hastreiter
Description:
Tenant improvement for commercial restaurant
Permit Reviews
Permit Number - TC-COM-1223-02796
Permit Status: Complete
Permit Description: Tenant improvement for commercial restaurant
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
06/04/2024 | COMMERCIAL REVIEW - FULL v.1 | 06/05/2024 | APPROVED |
05/20/2024 | COMMERCIAL REVIEW - FULL v.4 | 05/21/2024 | APPROVED |
10/24/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/28/2024 | APPROVED |
03/16/2024 | COMMERCIAL REVIEW - FULL v.2 | 04/22/2024 | REQUIRES RESUBMIT |
10/16/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/17/2024 | APPROVED |
05/21/2024 | RESTAMP - COMMERCIAL v.1 | 05/23/2024 | REQUIRES RESUBMIT |
10/22/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/22/2024 | APPROVED |
06/04/2024 | RESTAMP - COMMERCIAL v.2 | 06/04/2024 | REQUIRES RESUBMIT |
12/07/2023 | COMMERCIAL REVIEW - FULL v.1 | 02/28/2024 | REQUIRES RESUBMIT |
05/06/2024 | COMMERCIAL REVIEW - FULL v.3 | 05/20/2024 | REQUIRES RESUBMIT |
08/12/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/16/2024 | APPROVED |
Conditions
Permit Number - TC-COM-1223-02796
Permit Status: Complete
Permit Description: Tenant improvement for commercial restaurant
Date | Description | Comments |
---|---|---|
03/18/2024 | AIR BALANCING REPORT IS REQUIRED. | |
06/05/2024 | The Contractor you have added to your permit cannot be verified. Please contact staff to have the ROC number added to the account. | |
12/07/2023 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
03/18/2024 | COUNTY HEALTH INSPECTION IS REQUIRED - PLEASE PROVIDE DOCUMENTATION THAT THE INSPECTION HAS BEEN COMPLETED AND PASSED. | |
03/18/2024 | SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED. | |
03/18/2024 | SPECIAL INSPECTION FOR STRUCTURAL STEEL IS REQUIRED | |
03/18/2024 | WATER STERILIZATION REPORT IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-1223-02796
Permite Description: Tenant improvement for commercial restaurant
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
COT - FCON - Hood System - Final | N/A | Not Ready | Will call back in once Subcontractor permit is called in and Hood System is tested. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-1223-02796
Permit Description: Tenant improvement for commercial restaurant
Total Completed Inspections - 23
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/31/2024 | COT - HCPL - Rough Soil | Passed | Contractor will build at their own risk. EWS. Interior plumbing for bar area, floor sinks, kitchen area and restrooms. | |
07/17/2024 | COT - HCBU - Framing | Passed | ||
07/19/2024 | COT - HCEL - Electrical Intermediate | Passed | Ok to cover walls. System is bonded to gas line inside suite. | |
07/19/2024 | COT - HCPL - Plumbing Intermediate | Passed | ||
07/19/2024 | COT - HCPL - Gas Pressure Test | Passed | ||
08/09/2024 | BULD - Electrical Clearance | Passed | pass | |
08/29/2024 | COT - HCPL - Plumbing Above Ceiling | Passed | ||
08/29/2024 | COT - HCEL - Electrical Above Ceiling | Passed | ||
09/17/2024 | COT - HCME - Mechanical Above Ceiling | Passed | ||
09/17/2024 | COT - HCBU - Building Above Ceiling | Passed | ||
10/09/2024 | COT - HCEL - Electrical Final | Passed | ||
10/08/2024 | TRSP - ROW - Final/Close-Out | Passed | ||
10/09/2024 | ENGR Engineering Final | Passed | ||
10/09/2024 | COT - HCME - Mechanical Intermediate | Passed | ||
10/16/2024 | COT - HCPL - Plumbing Final | Passed | ||
10/16/2024 | COT - HCPL - Gas Final | Passed | ||
10/17/2024 | COT - HCME - Mechanical Final | Passed | Air balance test results submitted to COT. | |
10/17/2024 | COT - HCME - Kitchen Hood | Passed | ||
10/21/2024 | COT - FCON - Fire - Final | Passed | ||
10/21/2024 | COT - BULD - SWG Clearance | Passed | ||
10/21/2024 | COT - FCON - Hood System - Final | Passed | ||
10/22/2024 | COT - HCBU - TCO | Passed | Ok for level 4 TCO | |
10/30/2024 | COT - HCBU - Building Final | Passed |