Inspection Status: Not Ready
Inspection History: BULD - Electrical Clearance
| Date |
Description |
Inspector |
Results |
Comments |
| 08/09/2024 |
BULD - Electrical Clearance |
|
Not Ready |
CT can requires bond bushing line side two risers and torque stripes and letter of torque on all connections. Disconnect requires torque stripe on top connections and letter of torque |
| 08/09/2024 |
BULD - Electrical Clearance |
|
Passed |
pass |