Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Commercial Building
Address:
3552 N STONE AV
Address NEW:
3552 N STONE AV
Apply Date:
12/01/2022
Applicant:
Andrew Denton
Description:
5-foot block wall & 3-foot rod iron around perimeter of property, vehicular & pedestrian gates.

Permit Reviews

Permit Number - TC-COM-1222-00212
Permit Status: Complete
Permit Description: 5-foot block wall & 3-foot rod iron around perimeter of property, vehicular & pedestrian gates.
Start Date Submittal Complete Date Status  
11/14/2023 COMMERCIAL REVIEW - FULL v.1 12/14/2023 APPROVED Review Details
12/12/2022 COMMERCIAL REVIEW - FULL v.1 01/30/2023 REQUIRES RESUBMIT Review Details
09/11/2023 COMMERCIAL REVIEW - FULL v.2 09/11/2023 REQUIRES RESUBMIT Review Details
09/13/2023 COMMERCIAL REVIEW - FULL v.3 10/12/2023 APPROVED Review Details
10/12/2023 RESTAMP - COMMERCIAL v.1 10/12/2023 APPROVED Review Details

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-1222-00212
Permite Description: 5-foot block wall & 3-foot rod iron around perimeter of property, vehicular & pedestrian gates.
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
04/15/2024 COT - LCBU - Building Final N/A Re-inspection required Loose and missing bolts at post saddle. 4/5/2024

4/15/24: fasteners at post saddle not per plans throughout . Plans call for 3/8 Titan Anchor. Fasteners along East wall need to be properly fastened.

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-1222-00212
Permit Description: 5-foot block wall & 3-foot rod iron around perimeter of property, vehicular & pedestrian gates.
Total Completed Inspections - 6
Date Description Inspector Results Comments
10/16/2023 COT - LCEL - Electrical Underground Passed Approved per Ernie S, underground conduit from the house panel to the gate opener location, okay to backfill progress areas
11/20/2023 BULD - Electrical Clearance Passed TEP RECN
04/15/2024 COT - LCEL - Electrical Final Passed
04/15/2024 COT - FCON - Fire - Final Passed
04/16/2024 COT - LCBU - Building Final Passed
04/16/2024 ENGR Engineering Final Passed this inspection was for the bollards protecting the electrical gate access panel. the gate and any other issues that require inspection need to contact Building, spoke with Pete Lee with COT to confirm. this inspection “passed” was confirmed with Mr. David Robert’s.

Documents

File Name Document Type  
LOFC_LETTEROFCOMPLETION.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
2023-11-09 E-SHEETS 23073_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-SP S-S 2022 SOW_V3.PDF DOCUMENTS VIEW
2_PLAN SET - STONE POINT - DP - 04-28-23_V2_V1.PDF DOCUMENTS VIEW
2_PLAN SET - STONE POINT - DP - 04-28-23_V2_V2.PDF DOCUMENTS VIEW
2023-08-17 E-SHEETS 23073_V2.PDF DOCUMENTS VIEW
CONS-SP S-S 2022 SOW_V3.PDF DOCUMENTS VIEW
PREVIOUSLY APPROVED DEVELOPMENT PACKAGE_V3.PDF DOCUMENTS VIEW
RESPONSE LETTER TO PDSD REVIEW 9.12.2023_V1.PDF DOCUMENTS VIEW