Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Commercial Building
Address NEW:
310 N COMMERCE PARK LP
Apply Date:
10/16/2025
Applicant:
Cary Broschat
Description:
Canopy Group 4: Structures J, K, L & M

Permit Reviews

Permit Number - TC-COM-1125-02160
Permit Status: Inspections
Permit Description: Canopy Group 4: Structures J, K, L & M
Start Date Submittal Complete Date Status  
11/28/2025 COMMERCIAL REVIEW - FULL v.1 12/04/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-COM-1125-02160
Permit Status: Inspections
Permit Description: Canopy Group 4: Structures J, K, L & M
Total Outstanding Activity Conditions - 3
Date Name
11/28/2025 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
11/28/2025 SPECIAL INSPECTION OF HIGH STRENGHT BOLTS IS REQUIRED.
11/28/2025 SPECIAL INSPECTION OF WELDING IS REQUIRED.

Conditions

Permit Number - TC-COM-1125-02160
Permit Status: Inspections
Permit Description: Canopy Group 4: Structures J, K, L & M
Date Description Comments
11/28/2025 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
11/28/2025 SPECIAL INSPECTION OF STEEL FRAMES IS REQUIRED.

Outstanding Inspections

Permit Status: Inspections
Permit Number: TC-COM-1125-02160
Permite Description: Canopy Group 4: Structures J, K, L & M
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
07/22/2026 COT - LCBU - Excavation/Rebar/Zoning N/A Partial Pass
08/21/2026 COT - CSOL - Electrical Underground Solar Project N/A Partial Pass 08/21/2026
Partial pass at main electrical gear rack on south side of building. Verified progress areas below, okay to backfill.
1. Canopy group ABC underground conduit sch 40 to group E run of ~280'. Conduits: (3) 1.25", (2) 1", (2) 3" for future EV chargers.
2. Canopy group FGHI to JKLM, sch 40 conduit run between I to J: (3) 1", (1) 3"
3. Canopy group DE at lighting intercept and column disconnect: (3) 1"
4. Group 1 and 2 run to group 4: (3) 1.25", (2) 1", (2) 3"
5. Group 4 at Panel 1: (4) 3", (2) 1"