Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
11/20/2024
Applicant:
Daniel Schmidt
Description:
TI kitchen area in existing multipurpose hall (previous permit has been requested to be withdrawn)

Permit Reviews

Permit Number - TC-COM-1124-02243
Permit Status: Complete
Permit Description: TI kitchen area in existing multipurpose hall (previous permit has been requested to be withdrawn)
Start Date Submittal Complete Date Status  
01/23/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.1 01/28/2026 APPROVED Review Details
02/04/2026 SPECIAL INSPECTION REVIEW v.1 02/05/2026 REQUIRES RESUBMIT Review Details
12/04/2024 COMMERCIAL REVIEW - FULL v.1 12/04/2024 REQUIRES RESUBMIT Review Details
02/06/2026 SPECIAL INSPECTION REVIEW v.2 02/09/2026 APPROVED Review Details
03/07/2025 COMMERCIAL REVIEW - FULL v.3 04/02/2025 REQUIRES RESUBMIT Review Details
04/18/2025 COMMERCIAL REVIEW - FULL v.4 04/21/2025 APPROVED Review Details
12/13/2024 COMMERCIAL REVIEW - FULL v.2 01/14/2025 REQUIRES RESUBMIT Review Details
02/10/2026 SPECIAL INSPECTION REVIEW v.1 02/10/2026 APPROVED Review Details
04/21/2025 RESTAMP - COMMERCIAL v.1 04/23/2025 APPROVED Review Details

Conditions

Permit Number - TC-COM-1124-02243
Permit Status: Complete
Permit Description: TI kitchen area in existing multipurpose hall (previous permit has been requested to be withdrawn)
Date Description Comments
03/12/2025 AIR BALANCING REPORT IS REQUIRED.
03/12/2025 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
12/04/2024 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
03/12/2025 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
03/12/2025 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
03/12/2025 Post-Installed Anchor Inspection Report is required.
12/04/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
12/04/2024 A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit.
03/12/2025 WATER STERILIZATION REPORT IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-1124-02243
Permite Description: TI kitchen area in existing multipurpose hall (previous permit has been requested to be withdrawn)
Total Outstanding Inspections - 7
Last Inspection Date Description Inspector Results Comments
07/15/2025 COT - HCBU - Excavation/Rebar/Zoning N/A Not Ready
08/22/2025 COT - HCPL - Gas Pressure Test N/A Not Ready
08/22/2025 COT - HCBU - Building Above Ceiling N/A Not Ready
08/28/2025 COT - HCBU - Framing N/A Partial Pass
08/22/2025 COT - HCME - Mechanical Intermediate N/A Partial Pass
08/20/2025 COT - BULD - SWG Clearance N/A Partial Pass Rebar inspection for the grease trap in a private roadway. Also intermediate in walls.
12/02/2025 COT - FCON - Fire - Final N/A Re-inspection required Hood must pass, all exit signs shall illuminate after loss of a/c and head above stage shall be moved away from light

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-1124-02243
Permit Description: TI kitchen area in existing multipurpose hall (previous permit has been requested to be withdrawn)
Total Completed Inspections - 27
Date Description Inspector Results Comments
07/23/2025 COT - HCBU - Excavation/Rebar/Zoning Passed
07/23/2025 COT - HCPL - Rough Soil Passed
07/23/2025 COT - HCBU - Preslab Passed
08/22/2025 COT - HCEL - Electrical Intermediate Passed
08/22/2025 COT - HCEL - Electrical Above Ceiling Passed
08/22/2025 COT - HCPL - Plumbing Intermediate Passed
08/22/2025 COT - HCPL - Plumbing Above Ceiling Passed
08/25/2025 COT - HCBU - Interior Shear Bracing Passed
08/25/2025 COT - HCPL - Gas Pressure Test Passed
09/03/2025 COT - HCBU - Exterior Clips/Sheathing Passed
09/05/2025 COT - HCBU - Building Above Ceiling Passed
09/05/2025 COT - HCBU - Framing Passed
09/05/2025 COT - HCME - Mechanical Intermediate Passed
10/30/2025 COT - HCME - Mechanical Above Ceiling Passed
11/05/2025 COT - BULD - SWG Clearance Passed
11/10/2025 COT - HCME - Kitchen Hood Passed
11/10/2025 ENGR Engineering Final Passed
12/02/2025 COT - FCON - Sprinkler - Final Passed
12/02/2025 COT - FCON - Alarm - Final Passed
12/09/2025 COT - HCPL - Gas Final Passed
12/09/2025 COT - HCME - Mechanical Final Passed
12/08/2025 TRSP - ROW - Final/Close-Out Passed
12/09/2025 COT - HCBU - Building Final Passed
12/09/2025 COT - FCON - Fire - Final Passed
12/09/2025 COT - FCON - Hood System - Final Passed
12/09/2025 COT - HCPL - Plumbing Final Passed
12/09/2025 COT - HCEL - Electrical Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_COMMERCIAL (SSRS).PDF DOCUMENTS VIEW
OUR LADY OF LA VANG MECHANICAL TEST AND BALANCE REPORT_V1 (1)_V1.PDF DOCUMENTS VIEW
FINAL SIC-2026-02-05_V2.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-2025-02-13 (LA VANG KITCHEN T.I. - DELTA PERMIT SET)_V3.PDF DOCUMENTS VIEW
OLOLV_CALCULATIONS_DELTA_1__V3.PDF DOCUMENTS VIEW
OUR_LADY_OF_LA_VANG_SPECIFICATIONS 02192025_V3.PDF DOCUMENTS VIEW
SIC-2025-03-05_V1.PDF DOCUMENTS VIEW